Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Gabion Wall Including Security Fencing Nearby Tower Area And Along The Old Collapsed Portion Adjacent To Newly Constructed Retaining Wall At Akashvani Madikeri Karnataka.
|
| Description |
Construction Of Gabion Wall Including Security Fencing Nearby Tower Area And Along The Old Collapsed Portion Adjacent To Newly Constructed Retaining Wall At Akashvani Madikeri Karnataka.
|
| Organisation | Prasar Bharati, Broadcasting Corporation of India | Autonomous Bos |
| Tender Id | 2025_PrasarBharati_26189 |
|
Reference Number |
02/SEC/CCW/AIR/CHN/2025-26 |
| Tender Fee | 0 |
| EMD | 62873 |
| Tender Value | - |
| Place | Delhi |
| Link |
View Original Tender Notice
https://prasarbharati.eproc.in |
| Start Date | April 16, 2025 00:01 |
| End Date |
Expired
29/04/2025
Expired 535 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 02(two) nos. works at newly constructed synthetic football field located at uttar gakulnagar, twikarma, lichubagan under mungiakami rd block, khowai district namely i. paver block approach road ii. retaining wall.
Construction of 02(two) nos. works at newly constructed synthetic football field located at uttar gakulnagar, twikarma, lichubagan under mungiakami rd block, khowai district namely i. paver block approach road ii. retaining wall.
Read moreShifting of 11kv line, lt line and transformer during work of construction of road and retaining wall for approach road of newly constructed bridge in u/s of dehradun ambala road xing in district saharanpur
Shifting of 11kv line, lt line and transformer during work of construction of road and retaining wall for approach road of newly constructed bridge in u/s of dehradun ambala road xing in district saharanpur
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnatakaconstruction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka
Construction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka
Read moreConstruction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka
Construction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka
Read moreReconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).
Reconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).
Read moreReconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).
Reconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).
Read moreReconstruction of 30mts collapsed security fencing wall rear side portion of scob at akashvani, kothagudem.
Reconstruction of 30mts collapsed security fencing wall rear side portion of scob at akashvani, kothagudem.
Read moreAuction of newly constructed shop no. 05 above the constructed shops adjacent to the municipal boundary (unreserved)
Auction of newly constructed shop no. 05 above the constructed shops adjacent to the municipal boundary (unreserved)
Read moreof your Industry type