Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Engagement Of Man Power For Operation And Minor Maintenance Of Pump Motor Sets At Rhe Ailakandi, Site B, In The Dist. Of Bankura Under Purulia Electrical Section H.D For The Period Of 12 Months.
|
Organisation | HOUSING DIRECTORATE | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 11235 |
Tender Value | |
Place | purulia |
Link |
AAAAAAAAAA Login to view |
Start Date | June 11, 2025 23:30 |
End Date |
18/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreRfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreAnnual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Annual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Read moreMan power
Engaging of 16 nos., i.e., 12 nos., data entry operators (skilled), 2 nos., receipt and dispatch assistant (semi-skilled) and 2 nos., attender (un-skilled) in zone-i division of operation circle, visakhapatnam on work contract basis for a period of two years i.e., from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 19 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - ii, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read moreMan power
Engaging of 16 nos., i.e., 14 nos., data entry operators (skilled), 1 no. receipt and dispatch assistant (semi-skilled) and 1 no. attender (un-skilled) in zone-iii division of operation circle, visakhapatnam on work contract basis for a period of two years i.e., from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 18 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - iii, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 19 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - i, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read moreof your Industry type