Tender Details
Particulars | Details |
---|---|
Title |
For Supply And Erection Of Lagging And Aluminimum Cladding To Our 22 Co Operative Sugar Factories(except Ramala And Sathiaon) In Uttar Pradesh
|
Description |
For Supply And Erection Of Lagging And Aluminimum Cladding To Our 22 Co Operative Sugar Factories(except Ramala And Sathiaon) In Uttar Pradesh
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPSFF_826825_1 |
Reference Number |
334/UPF/TECH/370/2023-24 |
Tender Fee | 2360 |
EMD | 10 Lakh |
Tender Value | |
Place | Lucknow |
Link | https://etender.up.nic.in |
Start Date | August 06, 2023 00:25 |
End Date |
28/08/2023 ( Expired 653 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreShort term maintenance contract work for ch-38.853km to 40.00km of nh-330d in district sitapur in state of uttar pradesh.
Short term maintenance contract work for ch-38.853km to 40.00km of nh-330d in district sitapur in state of uttar pradesh.
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreO and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
Read moreProviding gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreof your Industry type