Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
For Supply And Erection Of Lagging And Aluminimum Cladding To Our 22 Co Operative Sugar Factories(except Ramala And Sathiaon) In Uttar Pradesh
|
Description |
For Supply And Erection Of Lagging And Aluminimum Cladding To Our 22 Co Operative Sugar Factories(except Ramala And Sathiaon) In Uttar Pradesh
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPSFF_826825_1 |
Reference Number |
334/UPF/TECH/370/2023-24 |
Tender Fee | 2360 |
EMD | 10 Lakh |
Tender Value | |
Place | Lucknow |
Link | https://etender.up.nic.in |
Start Date | August 06, 2023 00:25 |
End Date |
28/08/2023 ( Expired 656 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreSupply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Read moreShort term maintenance contract work for ch-38.853km to 40.00km of nh-330d in district sitapur in state of uttar pradesh.
Short term maintenance contract work for ch-38.853km to 40.00km of nh-330d in district sitapur in state of uttar pradesh.
Read moreShort term maintenance contract work for ch- 46.220km to 72.00 km of nh-727h in district sitapur in the state of uttar pradesh
Short term maintenance contract work for ch- 46.220km to 72.00 km of nh-727h in district sitapur in the state of uttar pradesh
Read moreof your Industry type