Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavating In Post Holes Or Similar Holes Of 5 Cum Filling Ramming Earth And Removing Surplus Soil,
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4596382 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 05, 2024 17:41 |
| End Date |
Expired
15/03/2024
Expired 943 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | NOBLE ENTERPRISES | - | 14-03-2024 13:03:10 | MSE | Qualified |
| 2 | SCANTEK ENTERPRISES | - | 13-03-2024 12:52:42 | MSE | Qualified |
| 3 | VERMA INDUSTRIES | - | 14-03-2024 11:50:19 | MSE | Qualified |
Earth filling(replacement of existing soil upto 4m) for the archagar and staff quarters
Earth filling (replacement of existing soil upto 4m) for the archagar and staff quarters belong to arulmigu raveeswarar, temple,vyasarpadi, chennai
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreExcavating in post holes or similar holes of 5 cum filling ramming earth and removing surplus soil,
Read more
Excavating in post holes or similar holes of 5 cum filling ramming earth and removing surplus soil,
Read more
Excavating in post holes or similar holes of 5 cum filling ramming earth and removing surplus soil,
Read more
Excavating in post holes or similar holes each n exc 0.5 cum, getting out, returning, filling in an
Read more
Feeler gauges - engineering metrology - as per is 3179,excavating in post holes or similar holes ea
Read more
Excavating, removing, filling of soil and supply & fixing of water pipe at kanjoli line bharatpur
Read more
Earth/soil filling for park...
Earth/soil filling for park area between the road no. 8 and 9 in r and r pocket in sector-3extn. hsiidc ie karnal.
Read moreof your Industry type