Tender Details

Particulars Details
Title
Engagement Of User Fee Collection Agency At Veeraanjaneyapuram Tp At Design Km 94.740 For Rehabilitation And Upgradation Of Nh 565 From Km 86.057 To 132.920 Nagarjuna Sagar Dam To Davulapally Section To Two Lane With Paved Shoulder In Andhra Pradesh
Description
Engagement Of User Fee Collection Agency At Veeraanjaneyapuram Tp At Design Km 94.740 For Rehabilitation And Upgradation Of Nh 565 From Km 86.057 To 132.920 Nagarjuna Sagar Dam To Davulapally Section To Two Lane With Paved Shoulder In Andhra Pradesh
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_213750_1
Reference
Number
NHAI/13013/547/CO/24-25/EQ /Veeraanjaneyapuram FP
Tender Fee 0
EMD 0
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=235760

Start Date November 07, 2024 23:30
End Date
Expired 13/11/2024

Expired 689 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Consultancy services for authoritys engineer for supervision of upgradation of davulapally to mallapalem section design ch. km 133.922 to km 154.216 existing ch. km 133.922 to km 154.900 of nh 565 to 2 lane with paved shoulder in the state of andhra

Consultancy services for authoritys engineer for supervision of upgradation of davulapally to mallapalem section design ch. km 133.922 to km 154.216 existing ch. km 133.922 to km 154.900 of nh 565 to 2 lane with paved shoulder in the state of andhra

Read more
Engagement of user fee collection agency on the basis of cb through etender for veeraanjaneyapuram tp at design km 94.740 for rehabilitation and upgradation of nh-565 in andhra pradesh

Engagement of user fee collection agency on the basis of cb through etender for veeraanjaneyapuram tp at design km 94.740 for rehabilitation and upgradation of nh-565 in andhra pradesh

Read more
Consultancy services for authority engineer for supervision of construction of 4l with paved shoulders bypass nalgonda to town from km 0.0 to km 14.0 ext. km 18.710 to km 28.685 of nakrekal to nagarjuna sagar section of nh 565 in telangana

Consultancy services for authority engineer for supervision of construction of 4l with paved shoulders bypass nalgonda to town from km 0.0 to km 14.0 ext. km 18.710 to km 28.685 of nakrekal to nagarjuna sagar section of nh 565 in telangana

Read more
Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual

Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual

Read more
Widening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71

Widening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71

Read more
Widening of pasnoor to nagarjuna sagar road from km 0/0 to 8/5 in nalgonda district

Widening of pasnoor to nagarjuna sagar road from km 0/0 to 8/5 in nalgonda district

Read more
Strengthening of two lane with paved shoulder from km17/8 18/2, construction of two lane with paved shoulder from km 18/2 to km 20/0 and construction of four lane with paved shoulder from km 20/0 to km 35/6 of salem -thirupathur -vaniyambadi road

Strengthening of two lane with paved shoulder from km17/8 -18/2, construction of two lane with paved shoulder from km 18/2 to km 20/0 and construction of four lane with paved shoulder from km 20/0 to km 35/6 of salem -thirupathur- vaniyambad

Read more
Operation and maintenance of 2 lane with paved shoulder of penchalkona to yerpedu section from 425.400 to km 509.400 of nh-565 (total length 84.00 km) in the state of ap under opbc

Operation and maintenance of 2 lane with paved shoulder of penchalkona to yerpedu section from 425.400 to km 509.400 of nh-565 (total length 84.00 km) in the state of ap under opbc

Read more
Upgradation of davualapally to mallapalem section design ch. km 133.922 to km 154.216 existing ch. km 133.922 to km 154.900 of nh 565 to 2 lane with paved shoulder in the state of andhra pradesh mode under annual plan 2023 24

Upgradation of davualapally to mallapalem section design ch. km 133.922 to km 154.216 existing ch. km 133.922 to km 154.900 of nh 565 to 2 lane with paved shoulder in the state of andhra pradesh mode under annual plan 2023 24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise