Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Hiring Of Consultant For Cost Estimation For Site Restoration Fund
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/4497410 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 17, 2024 23:06 |
| End Date |
Expired
07/02/2024
Expired 984 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | MFORU CONSULTANCY SERVICES (OPC) PRIVATELIMITED | 05-02-2024 18:05:22 | Registered with designated Agency / Authority | N/A | Disqualified |
| 2 | S. MARK ENGINEERING (I) PRIVATE LIMITED | 14-02-2024 14:14:02 | Offline upload | N/A | Qualified |
| 3 | TECHNISUR ENGINEERING PRIVATE LIMITED | 21-02-2024 17:24:39 | Registered with designated Agency / Authority | MSE | Disqualified |
Software for belt conveyor design as per is: 11592 and cost estimation
Software for belt conveyor design as per is: 11592 and cost estimation
Read morePreparation of a complete la proposal, pir, cost estimation, necessary documents etc
Preparation of a complete la proposal, pir, cost estimation, necessary documents etc
Read morePreparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Preparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Read morePreparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Preparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Read morePreparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Preparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Read morePreparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Preparation of a complete la proposal, pir, cost estimation, necessary documents etc.
Read moreDesign and cost estimation for construction of single span 400 meter two lane class a loading motor bridge
Design and cost estimation for construction of single span 400 meter two lane class a loading motor bridge (design and drawing of bridge, vetting of design and drawing, preparation of dpr and forest proposal in distt. champawat uttarakhand india
Read moreRestoration of damaged 11kv intake line-ii at dam site of dulhasti power station
Restoration of damaged 11kv intake line-ii at dam site of dulhasti power station
Read moreConstruction, preservation, restoration of british heritage site at haraputa shantali nelc mission complex. tn_48_05
Construction, preservation, restoration of british heritage site at haraputa shantali nelc mission complex. tn_48_05
Read moreof your Industry type