Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sale And Disposal Of Stacked Surplus Excavated Earth From Various Construction Sites Inside Cyberpark Campus, Kozhikode On As Is Where Is Basis
|
| Description |
Sale And Disposal Of Stacked Surplus Excavated Earth From Various Construction Sites Inside Cyberpark Campus, Kozhikode On As Is Where Is Basis
|
| Organisation | Kerala State IT Infrastructure Ltd | State Govt. and UT |
| Tender Id | 2026_KSITI_850471_1 |
|
Reference Number |
KITFRA/IT/CP/2026-27/02 |
| Tender Fee | 5900 |
| EMD | 25000 |
| Tender Value | - |
| Place | Cyberpark, Nellikode, Kozhikode |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1437035 |
| Start Date | May 14, 2026 15:30 |
| End Date |
Expired
22/05/2026
Expired 148 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Sale of excavated hard rock from excavation of approach channel, spill channel, cot, chute fall, of fatehpur tank construction site as is where is basis.
Read moreFinalization of service provider for entering into framework agreement with bhel for disposal of scrap and other surplus material through forward e-auction across all bhel units /regions/divisions/project sites for two years.
Finalization of service provider for entering into framework agreement with bhel for disposal of scrap and other surplus material through forward e-auction across all bhel units /regions/divisions/project sites for two years.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSale and disposal of stacked surplus excavated earth from various construction sites inside cyberpark campus, kozhikode on as-is where is basis
Sale and disposal of stacked surplus excavated earth from various construction sites inside cyberpark campus, kozhikode on as is where is basis.
Read moreSale and disposal of surplus earth stacked at site away from education hub project site at pinarayi
Sale and disposal of surplus earth stacked away from the education hub project site at pinarayi, kannur
Read moreSale and disposal of surplus earth stacked at site away from education hub project site at pinarayi
Sale and disposal of surplus earth stacked at pinarayi education hub project site on as is where is condition
Read moreDisposal of excavated surplus earth from vvip guest house lucknow
Disposal of excavated surplus earth from vvip guest house lucknow
Read moreDisposal of surplus scrap material on as is where is
Disposal of surplus scrap material on as is where is
 basis
Read moreof your Industry type