Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
S/R To Nh 6 To Bhulda Road From Ch 0/150 To 0/283 Km For The Year 2023 24
|
| Description |
S/R To Nh 6 To Bhulda Road From Ch 0/150 To 0/283 Km For The Year 2023 24
|
| Organisation | Government of Odisha |
| Tender Id | 2023_CERWI_94036_2 |
|
Reference Number |
NCB 05 OF 2023-24 |
| Tender Fee | 4000 |
| EMD | 5080 |
| Tender Value | |
| Place | SUPERINTENDING ENGINEER, R.W DIV-I, KEONJHAR |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | September 08, 2023 23:30 |
| End Date |
Expired
15/09/2023
Expired 1020 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreEngagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreof your Industry type