Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A Mtc Swd In Sec 25, Rohtak...
|
| Description |
Annual Maintenance Estimate For Storm Water Drainage In Sector 25, Rohtak For The Year 2025 26.
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2026_HBC_496860_1 |
|
Reference Number |
20264836AEB4 5E2E 4D48 A67C 467EE9408F2E267HSV |
| Tender Fee | 1430 |
| EMD | 3960 |
| Tender Value | - |
| Place | Kalanaur |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=575376 |
| Start Date | January 14, 2026 22:35 |
| End Date |
Expired
21/01/2026
Expired 245 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreReactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
Reactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreA/mtc. of swd in sector-25, rohtak
Repair/rectification of water supply line with di pipe, slandered special etc. in sector-25, rohtak and all other works contingent thereto
Read moreA/mtc. of swd scheme in sec...
Annual maintenance estimate for storm water drainage in sector-6, rohtak for the year 2025-26.
Read moreA/mtc. of swd scheme in sec...
B04)-a/mtc. of swd scheme in sector-18, u/e, panipat-removing of silt from existing swd manholes of size 5x3 at various location and cleaning of swd lines of 400mm i/d with bucket type sewer cleaning machine in sector-18, u/e, panipat
Read moreA/mtc. of swd scheme in sec...
A/mtc of swd scheme in sector-27, u/e, rohtak (udar gagan area)
Read moreof your Industry type