Tender Details
Particulars | Details |
---|---|
Title |
Emergent Repair Work Including Overlay At Risk And Cost Of The Concessionaire For 4laning Of Indore Gujrat Mp Border On Bot (Toll) Basis From Km 9.500 To Km 171.000 Of Nh59 On Dbfot In The State Of Mp Under Nhdp Phase
|
Description |
Emergent Repair Work Including Overlay At Risk And Cost Of The Concessionaire For 4laning Of Indore Gujrat Mp Border On Bot (Toll) Basis From Km 9.500 To Km 171.000 Of Nh59 On Dbfot In The State Of Mp Under Nhdp Phase
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_215755_1 |
Reference Number |
NHAI/ROMP/IND/I-G/NH59/2024 |
Tender Fee | 50000 |
EMD | 1.51 Crore |
Tender Value | |
Place | NHAI RO Bhopal |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=238555 |
Start Date | November 22, 2024 18:50 |
End Date |
26/12/2024 ( Expired 141 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation maintenance stage for 4 laning of guna biaora section from km. 223.130 to km. 316.630 of nh-46 old nh 3 in the state of mp on bot toll on dbfot pattern under nhdp phase iv
Independent engineer services during operation maintenance stage for 4 laning of guna biaora section from km. 223.130 to km. 316.630 of nh-46 old nh 3 in the state of mp on bot toll on dbfot pattern under nhdp phase iv
Read moreEngagement of user fee agency through eq at jamli toll plaza in the state of madhya pradesh under nhdp phase iii on bot basis and upkeep/maintenance of adjacent toilet blocks including recouping the consumable items
Engagement of user fee agency through eq at jamli toll plaza in the state of madhya pradesh under nhdp phase iii on bot basis and upkeep/maintenance of adjacent toilet blocks including recouping the consumable items
Read moreEr of bc overlay and potholes patches raveling on mcw risk and cost of concessionaire of 4-lane of orai -bhognipur section (km 220 to 255) on nh-25 and bhognipur barah section (km 421 to km 449) on nh-2 on bot (annuity) basis
Er of bc overlay and potholes patches raveling on mcw risk and cost of concessionaire of 4-lane of orai -bhognipur section (km 220 to 255) on nh-25 and bhognipur barah section (km 421 to km 449) on nh-2 on bot (annuity) basis
Read moreEmergent repair work including overlay at risk and cost of the concessionaire for 4laning of indore gujrat mp border on bot (toll) basis from km 9.500 to km 171.000 of nh59 on dbfot in the state of mp under nhdp phase
Emergent repair work including overlay at risk and cost of the concessionaire for 4laning of indore gujrat mp border on bot (toll) basis from km 9.500 to km 171.000 of nh59 on dbfot in the state of mp under nhdp phase
Read moreIndependent engineer (ie) services during operation and maintenance period of 4l of godhra to guj/mp border section of nh-47 (old nh-59) from km 129.300 to km 215.900 in the state of gujarat on dbfot mode under nhdp phase iii
Independent engineer (ie) services during operation and maintenance period of 4l of godhra to guj/mp border section of nh-47 (old nh-59) from km 129.300 to km 215.900 in the state of gujarat on dbfot mode under nhdp phase iii
Read moreIndependent engineer services during o andd m period of 4 lane shivpuri guna including guna bypass section of nh 46 from km 125.430 to km 223.130 total length 97.700 km under dbfot pattern bot toll mode nhdp phase iv
Independent engineer services during o andd m period of 4 lane shivpuri guna including guna bypass section of nh 46 from km 125.430 to km 223.130 total length 97.700 km under dbfot pattern bot toll mode nhdp phase iv
Read moreUp-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (from km. 0.000 to km. 25.000 (design length 25.000 km)) in maharashtra to be d on bot (toll)mode (pkg-1)
Up-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (from km. 0.000 to km. 25.000 (design length 25.000 km)) in maharashtra to be d on bot (toll)mode (pkg-1)
Read moreSix laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-v from km.146.000 (chehedi khurdh) to km.190.560 (khandalwadi) in the state of maharashtra to be d on hybrid annuity mode under bmp
Six laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-v from km.146.000 (chehedi khurdh) to km.190.560 (khandalwadi) in the state of maharashtra to be d on hybrid annuity mode under bmp
Read moreUp-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (25.000 to km. 53.200 (design length 28.000 km)) in maharashtra to be d on bot (toll) mode (pkg-2)
Up-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (25.000 to km. 53.200 (design length 28.000 km)) in maharashtra to be d on bot (toll) mode (pkg-2)
Read moreSix laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-x from km 370.000 (chinchpur (b) village) to km 415.500 (nagobachiwadi village) in the state of maharashtra on ham under bmp
Six laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-x from km 370.000 (chinchpur (b) village) to km 415.500 (nagobachiwadi village) in the state of maharashtra on ham under bmp
Read moreof your Industry type