Tender Details

Particulars Details
Title
High Pressure Water Jet Cleaning Of Condenser Tubes And Lube Oil Cooler Tubes 2 Sets In Coming Overhauling Of Unit 1 At Stg I Sg Tpp During Aug 2025 Sgtpp
Description
High Pressure Water Jet Cleaning Of Condenser Tubes And Lube Oil Cooler Tubes 2 Sets In Coming Overhauling Of Unit 1 At Stg I Sg Tpp During Aug 2025 Sgtpp
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2025_WBPDC_829217_1
Reference
Number
WBPDCL/SGTPP/NIT/E3352/24-25
Tender Fee 0
EMD 10533
Tender Value
Place Adbuilding SGTPP P.O Manigram Dist Murshidabad
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1846475
Start Date March 22, 2025 15:30
End Date

14/04/2025 ( Expired 7 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of various size isolating valves for pressure gauges, transmitters for unit no.1 and 2 of ph-i at, sgtps,mppgcl, birsinghpur.

Procurement of various size isolating valves for pressure gauges, transmitters for unit no.1 and 2 of ph-i at, sgtps,mppgcl, birsinghpur.

Read more
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.

1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning and maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.

Read more
Overhauling of pa fan 1a and 1b and fd fan 1a and 1b during unit 1 overhauling scheduled to be held in august 2025 2x300mw sgtpp

Overhauling of pa fan 1a and 1b and fd fan 1a and 1b during unit 1 overhauling scheduled to be held in august 2025 2x300mw sgtpp

Read more
Painting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025

Painting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025

Read more
High pressure valves of unit no 1 scheduled in august 2025

High pressure valves of unit no 1 scheduled in august 2025

Read more
S/e of 2 no. 16mt. high mast lights and cabling, repairing of lt line, s/f of led street lights, repairing of led street lights and high mast flood lights, s/i of 10no. water cooler and related work at nmy muzaffarnagar

S/e of 2 no. 16mt. high mast lights and cabling, repairing of lt line, s/f of led street lights, repairing of led street lights and high mast flood lights, s/i of 10no. water cooler and related work at nmy muzaffarnagar

Read more
S/ f of 03 nos. water cooler with access, rep / exte of l.t. line, pole painting, tighte of over head line guardi repair of led street light, repa of 2 nos. high mast with old led flood light driver and inte elect in mandi office at nmy khalilabad

S/ f of 03 nos. water cooler with access, rep / exte of l.t. line, pole painting, tighte of over head line guardi repair of led street light, repa of 2 nos. high mast with old led flood light driver and inte elect in mandi office at nmy khalilabad

Read more
Boiler overhauling of pressure parts, safety valves soot blowers for boiler efficiency improvement steaming license renewal of unit no 1 in august sepember 2025

Boiler overhauling of pressure parts, safety valves soot blowers for boiler efficiency improvement steaming license renewal of unit no 1 in august sepember 2025

Read more
Eddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025

Eddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise