Tender Details
Particulars | Details |
---|---|
Title |
Investigation, Survey, Design, Construction, Testing, Commissioning And Operation And Maintenance Including Trial For 06 Months Construction And Successfully Commissioning Including Six Months Trail Of 0.10 Mgd Rapid Sand Filtration Plant Com
|
Description |
Investigation, Survey, Design, Construction, Testing, Commissioning And Operation And Maintenance Including Trial For 06 Months Construction And Successfully Commissioning Including Six Months Trail Of 0.10 Mgd Rapid Sand Filtration Plant Com
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHE_242836_1 |
Reference Number |
NIT35/PHEQ OF 2023-24 |
Tender Fee | 2000 |
EMD | 3.67 Lakh |
Tender Value | |
Place | Wavthora Aadbal |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=711921 |
Start Date | January 13, 2024 14:30 |
End Date |
22/01/2024 ( Expired 503 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreDesign, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreEoi for design, survey, supply, installation, testing, commissioning, operation n maintenance for 25 years from cod for 60 nos. grid connected solar power plants under pm-kusum scheme component a
Eoi for design, survey, supply, installation, testing, commissioning, operation n maintenance for 25 years from cod for 60 nos. grid connected solar power plants under pm-kusum scheme component a&#x0d
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreSurvey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Survey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreDesign, supply, installation, testing, commissioning of equipment, implementation and maintenance of smart campus ict solution for sant gadge baba amravati university, amravati, maharashtra, india
Design, supply, installation, testing, commissioning of equipment, implementation and maintenance of smart campus ict solution for sant gadge baba amravati university, amravati, maharashtra, india
Read moreCanal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass
Canal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass
Read moreof your Industry type