| Particulars | Details |
|---|---|
| Title |
Imp Estimate For Ht Link Line In Thandikudi Section
|
| Description |
Dindigul Edc Improvement Estimate For Proposed 22 Kv Ht Line Perumparai In Ae Tky
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_528054_1 |
|
Reference Number |
EEBTLDGLTSO6/24-25 |
| Tender Fee | 0 |
| EMD | 3000 |
| Tender Value | |
| Place | Batlagundu |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628760 |
| Start Date | February 26, 2025 15:30 |
| End Date |
Expired
11/03/2025
Expired 481 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for shifting of 11 kv ht line of shat feeder passing over lpg godown of sh. ram singh in e section parla bhuntar under esd hpsebl bhuntar
Tender for shifting of 11 kv ht line of shat feeder passing over lpg godown of sh. ram singh in e section parla bhuntar under esd hpsebl bhuntar
Read moreConstruction of ht covered conductor and ht abc for in connecting feeder through nh
Construction of ht covered conductor and ht abc for in connecting feeder through nh
Read moreConstruction of 33 kv link line for 33 11 kv ss pokhrbitwa siddarthnagar from 132 33 kv ss shoharatgarh siddrthnagar
Construction of 33 kv link line for 33 11 kv ss pokhrbitwa siddarthnagar from 132 33 kv ss shoharatgarh siddrthnagar
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreImp of cc passage at shradha building saint gorge hospital, beat no 225 in a ward
Imp of cc passage at shradha building saint gorge hospital, beat no 225 in a ward
Read moreEngagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Read moreEstimate for functional house tap connection at village mahagaon tq risod dist washim
Estimate for functional house tap connection at village mahagaon tq risod dist washim
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreTo develop a comprehensive integrated scheme of water supply arrangement through pipeline network and related electrical and mechanical of line-10 and derawal nagar to r k ashram marg section of line-8 ext. of delhi mrts project of phase-iv.
To develop a comprehensive integrated scheme of water supply arrangement through pipeline network and related electrical and mechanical of line-10 and derawal nagar to r k ashram marg section of line-8 ext. of delhi mrts project of phase-iv.
Read moreof your Industry type