Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Zone Safety Items And Di During Construction Period On The Risk And Cost Of Epc Contractor In Maheshkhunt Saharsa Purnea Section From Km. 90.000 To Km. 177.960 Of Nh 107 (Pkg Ii) In The State Of Bihar(total Length 87.96).
|
| Description |
Work Zone Safety Items And Di During Construction Period On The Risk And Cost Of Epc Contractor In Maheshkhunt Saharsa Purnea Section From Km. 90.000 To Km. 177.960 Of Nh 107 (Pkg Ii) In The State Of Bihar(total Length 87.96).
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_241551_1 |
|
Reference Number |
NIT No- 284/RO-PATNA/NHAI/2025- 26 |
| Tender Fee | 10000 |
| EMD | 36.2 Lakh |
| Tender Value | - |
| Place | NHAI, RO- Patna |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=275503 |
| Start Date | July 17, 2025 15:40 |
| End Date |
Expired
31/07/2025
Expired 444 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of operation and maintenance works on selected stretches of puintola tangi of nh 16 including construction of drains and slabs at location delinked from scope of epc contractor at the risk n cost of epc contractor 2nd call
Execution of operation and maintenance works on selected stretches of puintola tangi of nh 16 including construction of drains and slabs at location delinked from scope of epc contractor at the risk n cost of epc contractor 2nd call
Read moreRectification and filling of potholes at 47 locations in duburi chandikhikhole section of nh 53 at the risk n cost of the epc contractor in the state of odisha 2nd call
Rectification and filling of potholes at 47 locations in duburi chandikhikhole section of nh 53 at the risk n cost of the epc contractor in the state of odisha 2nd call
Read moreRectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreExecution of maintenance works in six laning of bihar - jharkhand border chordaha - gorhar section of nh-2 from km 261.150 to km 320.810 in the state of jharkhand at the risk and cost of the epc contractor
Execution of maintenance works in six laning of bihar - jharkhand border chordaha - gorhar section of nh-2 from km 261.150 to km 320.810 in the state of jharkhand at the risk and cost of the epc contractor
Read more4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.
4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.
Read moreOverlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreRectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor
Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor
Read more8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
Read morePavement rectification work on existing road of haridwar-dehradun section (pkg-2) at risk and cost of contractor
Pavement rectification work on existing road of haridwar-dehradun section (pkg-2) at risk and cost of contractor from mohkampur ch.158.900 to laltappar ch.181.100 of nh-07 in state of ukd
Read moreof your Industry type