Tender Details

Particulars Details
Title
Work Zone Safety Items And Di During Construction Period On The Risk And Cost Of Epc Contractor In Maheshkhunt Saharsa Purnea Section From Km. 90.000 To Km. 177.960 Of Nh 107 (Pkg Ii) In The State Of Bihar(total Length 87.96).
Description
Work Zone Safety Items And Di During Construction Period On The Risk And Cost Of Epc Contractor In Maheshkhunt Saharsa Purnea Section From Km. 90.000 To Km. 177.960 Of Nh 107 (Pkg Ii) In The State Of Bihar(total Length 87.96).
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_241551_1
Reference
Number
NIT No- 284/RO-PATNA/NHAI/2025- 26
Tender Fee 10000
EMD 36.2 Lakh
Tender Value -
Place NHAI, RO- Patna
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=275503

Start Date July 17, 2025 15:40
End Date
Expired 31/07/2025

Expired 444 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Execution of operation and maintenance works on selected stretches of puintola tangi of nh 16 including construction of drains and slabs at location delinked from scope of epc contractor at the risk n cost of epc contractor 2nd call

Execution of operation and maintenance works on selected stretches of puintola tangi of nh 16 including construction of drains and slabs at location delinked from scope of epc contractor at the risk n cost of epc contractor 2nd call

Read more
Rectification and filling of potholes at 47 locations in duburi chandikhikhole section of nh 53 at the risk n cost of the epc contractor in the state of odisha 2nd call

Rectification and filling of potholes at 47 locations in duburi chandikhikhole section of nh 53 at the risk n cost of the epc contractor in the state of odisha 2nd call

Read more
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Read more
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh

Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.

Read more
Execution of maintenance works in six laning of bihar - jharkhand border chordaha - gorhar section of nh-2 from km 261.150 to km 320.810 in the state of jharkhand at the risk and cost of the epc contractor

Execution of maintenance works in six laning of bihar - jharkhand border chordaha - gorhar section of nh-2 from km 261.150 to km 320.810 in the state of jharkhand at the risk and cost of the epc contractor

Read more
4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.

4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.

Read more
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor

Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor

Read more
Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor

Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor

Read more
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor

8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor

Read more
Pavement rectification work on existing road of haridwar-dehradun section (pkg-2) at risk and cost of contractor

Pavement rectification work on existing road of haridwar-dehradun section (pkg-2) at risk and cost of contractor from mohkampur ch.158.900 to laltappar ch.181.100 of nh-07 in state of ukd

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise