Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Surface Preparation Of Existing (Grinding/Levelling/Scraping Of Top Layer Including Minor Patch Wor
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5514904 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 05, 2024 21:35 |
| End Date |
Expired
26/11/2024
Expired 689 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Providing and executing wall painting including surface preparation, scraping, crack filling, one coat exterior primer, two coats premium exterior acrylic emulsion paint, artwork, lettering, logo, slogan, complete as per approved design,
Providing and executing wall painting including surface preparation, scraping, crack filling, one coat exterior primer, two coats premium exterior acrylic emulsion paint, artwork, lettering, logo, slogan, complete as per approved design,
Read moreSite preparation, earthwork and formation,laser levelling and compaction,topsoil preparation and compost mixing,bermuda grass turf installation,turf rolling, top dressing and finishing,field markings,hockey goal posts, backboards and nets,boundary fencing,maintenance and establishment period,labor, machinery and transportation,testing handover and documentation
Site preparation, earthwork and formation,laser levelling and compaction,topsoil preparation and compost mixing,bermuda grass turf installation,turf rolling, top dressing and finishing,field markings,hockey goal posts, backboards and nets,boundary fencing,maintenance and establishment period,labor, machinery and transportation,testing handover and documentation
Read moreSite preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Read moreSite preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Read moreSurface preparation of existing (grinding/levelling/scraping of top layer including minor patch wor
Read more
Surface preparation of existing surface (grinding/ levelling/ scrapping of top layer,eight layered
Read more
Surface preparation of existing surface (grinding/ levelling/ scrapping of top layer,eight layered
Read more
Civil work sub base and base preparation,synthetic layer all weather synthetic surface 8 layer,badm
Read more
of your Industry type