Tender Details
Particulars | Details |
---|---|
Title |
W97050097012 Male Plastic Plugs Kit For Hydraulic Pipes As Per Bhel Drawing 47829713543 Size: P/N 1
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 24, 2025 17:19 |
End Date |
05/05/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Concentric reducer, size 80 x 65 nb, bw, sa 420 wpl6 class-1 as per ts no. pb-m-48 (r-4) & addenda,
Read more
Seamless 40 nb size sa333 gr-6 class-1 feeder pipes as per the specifications pb-m-48 (r-4) & adden
Read more
Crank shaft as per drawing no. ccs-722r 1 for 350 ton hmt (1601) press msf m/c no. 6944 at ccs
Read more
Supply of 12 point 7mm 1 oblic 2 inch bihexagonal square driver socket make taparia size of as per
Read more
1 mm thick m s door shutter of size 7 feet x 3 feet with door frame as per specification.,1 mm thic
Read more
1 mm thick m s door shutter of size 7 feet x 3 feet with door frame as per specification.,1 mm thic
Read more
Oil operated double acting guide vane servomotor (hydraulic cylinders, module-1 & module-2) as per
Read more
Work of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar
Work of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreof your Industry type