Tender Details
Particulars | Details |
---|---|
Title |
Four Wheel Trolley
|
Description |
Supply And Delivery Of Ms Make Hydraulic 4 Wheel Trolley For Boduppal Municipal Corporation Under General Funds
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 600817 |
Reference Number |
MCB/E1/02/2024-25/ 4 Wheel Trolley |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | May 29, 2025 22:00 |
End Date |
02/06/2025 ( Expired 7 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Weapon handling trolley with attachments,munition handling trolley with rocket transport module,mun
Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read morePerformance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreConsultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh
 stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreConstruction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreof your Industry type