Tender Details

Particulars Details
Title
Annual Maintenance Of Led Street Light And High Mast Light System In Old Faridabad Constituency From Ward No.28 To 34 And 13.
Description
Annual Maintenance Of Led Street Light And High Mast Light System In Old Faridabad Constituency From Ward No.28 To 34 And 13.
Organisation Haryana Government | State Govt. and UT
Tender Id 2025_HRY_432746_1
Reference
Number
2025A13916AD EA77 45C2 BCFF 02CBFB2E659C284ULB
Tender Fee 6180
EMD 2.46 Lakh
Tender Value
Place Faridabad (MC)
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509876
Start Date March 11, 2025 20:30
End Date

20/03/2025 ( Expired 80 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le

Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka

Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Maintenance work from km11/2 to km 13/6 (length 2.40 km) section of nh 86ext under short term maintenance contract in the state of madhya pradesh

Maintenance work from km11/2 to km 13/6 (length 2.40 km) section of nh 86ext under short term maintenance contract in the state of madhya pradesh

Read more
Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Read more
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.

Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise