Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Insert Screw To Suit On Side And Face Milling Cutter Having Suitable Insert Pockets,Side And Face M
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/6273962 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | May 26, 2025 18:20 |
End Date |
10/06/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreZone-1 chhata room no. 43, from char puliya in foundry nagar to kk nagar road on the way to nagar, interlocking work on road and side track by hotmix.
Zone-1 chhata room no. 43, from char puliya in foundry nagar to kk nagar road on the way to nagar, interlocking work on road and side track by hotmix.
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreO and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreSupply and delivery of various sizes of class k7 and k9 ductile iron pipes conforming to is 8329 2000 to its latest revision including rubber gasket epdm conforming to is 5382 1985 to its latest revision for o and m works on arc basis 2025 to 2026
Supply and delivery of various sizes of class k7 and k9 ductile iron pipes conforming to is 8329 2000 to its latest revision including rubber gasket epdm conforming to is 5382 1985 to its latest revision for o and m works on arc basis 2025 to 2026
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Read moreof your Industry type