Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Estimate For Reconstruction Katehra Minor By Concrete Lining From Rd 0 10830 (Tail)
|
Description |
Estimate For Reconstruction Katehra Minor By Concrete Lining From Rd 0 10830 (Tail)
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id | 2025_WR_137602_1 |
Reference Number |
Notice No. 2652 /25M/2024-25 |
Tender Fee | 15900 |
EMD | 3.05 Lakh |
Tender Value | |
Place | Gidderbaha |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=277927 |
Start Date | March 28, 2025 15:30 |
End Date |
21/04/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreSs of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Read moreRestoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Restoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Read moreProv laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Read moreExecution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti
Execution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Read moreEstimate for laying of cc road from main gate to bison enclosure in kakathiya zoological park, hanumakonda during 2025-26
Estimate for laying of cc road from main gate to bison enclosure in kakathiya zoological park, hanumakonda during 2025-26
Read moreof your Industry type