Tender Details

Particulars Details
Title
The Work Of Sitc Of The 3 Kva Ups With Battery Backup And Three Year Warranty In Rooms At Annex Building Mho
Description
The Work Of Sitc Of The 3 Kva Ups With Battery Backup And Three Year Warranty In Rooms At Annex Building Mho
Organisation Municipal Corporation of Greater Mumbai | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 4394
EMD 14000
Tender Value
Place BMC HO
Link

AAAAAAAAAA

Login to view
Start Date April 08, 2025 14:30
End Date

25/04/2025 ( 2 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.

Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.

Read more
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.

Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.

Read more
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode

Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode

Read more
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan

Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan

Read more
Replacement of filter media in slow sand filter bed with replacement of door of guard room

Replacement of filter media in the slow sand filter bed with replacement of door and of guard room, repairing of storage godown and fittings and face lifting etc. at lallmitti water treatment plant under beodnabad section.

Read more
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state

Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state

Read more
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india

Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise