Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Sitc Of The 3 Kva Ups With Battery Backup And Three Year Warranty In Rooms At Annex Building Mho
|
Description |
The Work Of Sitc Of The 3 Kva Ups With Battery Backup And Three Year Warranty In Rooms At Annex Building Mho
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 4394 |
EMD | 14000 |
Tender Value | |
Place | BMC HO |
Link |
AAAAAAAAAA Login to view |
Start Date | April 08, 2025 14:30 |
End Date |
25/04/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreDesign and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Read moreReplacement of filter media in slow sand filter bed with replacement of door of guard room
Replacement of filter media in the slow sand filter bed with replacement of door and of guard room, repairing of storage godown and fittings and face lifting etc. at lallmitti water treatment plant under beodnabad section.
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreDesign, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type