Tender Details
Particulars | Details |
---|---|
Title |
System Augmentation/Straightening Work Under Edd Jahangirabad.
|
Description |
System Augmentation/Straightening Work Under Edd Jahangirabad.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_PVVNL_846164_1 |
Reference Number |
52/B/2023-2024/EDC-III |
Tender Fee | 3540 |
EMD | 35000 |
Tender Value | |
Place | BULANDSHAHR |
Link | https://etender.up.nic.in |
Start Date | October 04, 2023 23:30 |
End Date |
10/10/2023 ( Expired 591 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreProcurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for selected medical college hospitals under medical education and research department govt of assam
Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for &#x0d selected medical college hospitals&#x0d under medical education and research department&#x0d govt of assam&#x0d
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreWork servises for provision of infrastructure for
Work servises for provision of infrastructure for
 induction of trainer aircraft at afa under ge(afa) hyderabad.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read more84145/e8 provn of work services for pol store at af jorhat under ge (af) jorhat
84145/e8 provn of work services for pol store at af jorhat under ge (af) jorhat
Read moreConstruction and development work under cm infra phase 4 in raisen road work, building work, other component
Construction and development work under cm infra phase 4 in raisen road work, building work, other component
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreof your Industry type