Tender Details

Particulars Details
Title
Construction Of Cc Shoulder, Interlocking Tiles, Drain From Sitapur (Km 69) To Gaurikund (Km 75) Of Nh 107 (Old 109) In The State Of Uttarakhand
Description
Construction Of Cc Shoulder, Interlocking Tiles, Drain From Sitapur (Km 69) To Gaurikund (Km 75) Of Nh 107 (Old 109) In The State Of Uttarakhand
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_852296_1
Reference
Number
774/13 Yata-NH-10/2025 dt. 05.03.2025
Tender Fee 11800
EMD 7.62 Lakh
Tender Value -
Place NH-107
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=895934

Start Date March 22, 2025 17:30
End Date
Expired 07/04/2025

Expired 559 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.

Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).

Read more
Treatment of 01 nos of landslide location at ch. 91.125 to 91.415 (near gulabghati) on nh- 109 (old nh 87 ) in the state of uttarakhand under annual plan 2025-26

Treatment of 01 nos of landslide location at ch. 91.125 to 91.415 (near gulabghati) on nh- 109 (old nh 87 ) in the state of uttarakhand under annual plan 2025-26

Read more
Short term maintenance contract (stmc) work for the stretch of nh-87 (new nh-109) in km. 90 to 106 and km 116 to 120 in the state of uttarakhand

Short term maintenance contract (stmc) work for the stretch of nh-87 (new nh-109) in km. 90 to 106 and km 116 to 120 in the state of uttarakhand

Read more
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a.

Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a in the state of uttarakhand. (length 136 km).

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707a.

Widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707ain the state of uttarakhand. (length-175 km).

Read more
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.

Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).

Read more
Consultancy services for authority engineer for supervision of widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttar

Widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttarakhand on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise