Tender Details

About Tender

🏗️ Invitation For Bids: Construction Project On Nh 107(old 109) 🛣️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids From Reputable Contractors For The Construction Of A Cc Shoulder Culvert, Drain, And Repair Of Damage R/Wall And B/Wall On Nh 107(old 109) From Km 68.750 To Km 75.00, Under The Annual Plan Of Nh(o) 2023 24, In The State Of Uttarakhand. 📅 Bid Submission Deadline: June 27, 2024, 12:00 Pm Tender Fee: Inr 11,800 Earnest Money Deposit (Emd): Inr 10,96,000 Interested Bidders Must Possess The Necessary Qualifications And Experience In Similar Construction Projects. Detailed Bids, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Construction, Nh 107, Epc Mode, Ministry Of Road Transport And Highways, Uttarakhand, Infrastructure Development, Tender, Bid Submission, Earnest Money Deposit
Particulars Details
Title
Construction Of Cc Shoulder Culvert, Drain And Damage R/Wall And B/Wall From Km 68.750 To Km 75.00 On Nh 107(old 109) Under Annual Plan Of Nh(o) 2023 24 In The State Of Uttarakhand Under Epc Mode.
Description
Construction Of Cc Shoulder Culvert, Drain And Damage R/Wall And B/Wall From Km 68.750 To Km 75.00 On Nh 107(old 109) Under Annual Plan Of Nh(o) 2023 24 In The State Of Uttarakhand Under Epc Mode.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_800915_1
Reference
Number
1254/13Yata-Nh-10/2024 dated 14.03.2024
Tender Fee 11800
EMD 10.96 Lakh
Tender Value
Place NH-107(Old 109)
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841903
Start Date April 05, 2024 17:30
End Date

22/07/2024 ( Expired 337 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Read more
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise