Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Boys Toilet At Patrasayer Uttar Purba P.S Under Patrasayer Dev. Block Bankura. Fund Dmf
|
Description |
Construction Of Boys Toilet At Patrasayer Uttar Purba P.S Under Patrasayer Dev. Block Bankura. Fund Dmf
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1200 |
EMD | 7000 |
Tender Value | |
Place | Patrasayer Dev. Block |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 22:45 |
End Date |
24/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreConstruction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Construction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Read moreWard no 03 construction work of proposed hall shop block a and b on the first floor of the shopping complex built under idsmt scheme near shiv mandir
Ward no 03 construction work of proposed hall shop block a and b on the first floor of the shopping complex built under idsmt scheme near shiv mandir
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreLining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreConstruction of windrow platform, toilet, septic tank, prcessing shed etc. at trenching ground of sendhwa under sbm 2.0
Construction of windrow platform, toilet, septic tank, prcessing shed etc. at trenching ground of sendhwa under sbm 2.0
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.4
Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&#x0d &#x0d &#x0d
Read moreof your Industry type