Tender Details

Particulars Details
Title
Dry Brick On Edge Soling With New S.O.B. Brick Of M/E Shardanagar To Aira Bridge From Km. 7.400 To Km. 9.000 At L/B Of River Sharda In Distt. Lakhimpur Kheri.
Description
Dry Brick On Edge Soling With New S.O.B. Brick Of M/E Shardanagar To Aira Bridge From Km. 7.400 To Km. 9.000 At L/B Of River Sharda In Distt. Lakhimpur Kheri.
Organisation U P Irrigation Department (Civil) | State Govt. and UT
Tender Id 2025_UPIDC_1013094_1
Reference
Number
571/FDSNLMP/Dated-24.02.2025
Tender Fee 2714
EMD 66000
Tender Value
Place Lakhimpur Kheri
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1821636
Start Date March 04, 2025 15:30
End Date

10/03/2025 ( Expired 63 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)

Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.

Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.

Read more
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham

Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise