Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Four Wheel Barak Trolley
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5362708 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 05, 2024 16:14 |
| End Date |
Expired
26/09/2024
Expired 649 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | Army Traders India | Make : NA Model : Four Wheel Barak Trolley Title : Four Wheel Barak Trolley | 24-09-2024 01:35:22 | N/A | Disqualified |
| 2 | SHIVAM ENTERPRISES | Make : SANTH INDUSTRIAL SOLUTION PVT. LTD. Model : SIS-FBT-900 Title : Four Wheel Barak Trolley | 09-09-2024 15:11:20 | N/A | Disqualified |
| 3 | SHREE BALAJI ENTERPRISES | Make : Shree Balaji Model : Four Wheel Barak Trolley Title : Four Wheel Barak Trolley | 26-09-2024 06:03:21 | MSE | Qualified |
Supply of tractor (60 hp), bbf planter, rotavator, trolley and boom sprayer (400 ltr)
Supply of tractor (60 hp), bbf planter,&#x0d rotavator, trolley and&#x0d boom sprayer (400 ltr.)&#x0d
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreFour wheel trolley
Supply and delivery of ms make hydraulic 4 wheel trolley for boduppal municipal corporation under general funds
Read moreof your Industry type