Tender Details
Particulars | Details |
---|---|
Title |
Integrated Safety Survelliance Work For Better Safety During Overhauling
|
Description |
Integrated Safety Survelliance Work For Better Safety During Overhaulingof Units During 2024 2026.
|
Organisation | Bhartiya Rail Bijlee Company Limited | Public Sector Undertakings |
Tender Id | 2025_BRBCL_93884_1 |
Reference Number |
BRBCL/Nabinagar/9900295110 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bhartiya Rail Bijlee Company L H-Type Office, Than |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97098 |
Start Date | January 24, 2025 21:30 |
End Date |
07/02/2025 ( Expired 102 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreEmpanelment of road safety consultants for nhai projects
Empanelment of road safety consultants for nhai projects
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for traffic simulation model, road safety audit and city logistic plan for nashik and ch. sambhaji nagar cities of maharashtra
Consultancy services for traffic simulation model, road safety audit and city logistic plan for nashik and ch. sambhaji nagar cities of maharashtra
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type