Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Data Recovery And Data Wiping Service Data Wiping; Server; Not Applicable
|
| Description |
|
| Organisation | Department of Financial Services | Ministry of Finance |
| Tender Id | GEM/2025/B/6119920 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 07, 2025 22:24 |
| End Date |
Expired
17/04/2025
Expired 543 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Repairing of rhs propel drive (35720511000) rpd42 applicable for ekg10 cum rope shovel.
Repairing of rhs propel drive (35720511000) rpd42 applicable for ekg10 cum rope shovel.
Read moreSupply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system
Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system
Read moreConsultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreConsultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the kosi and gandak river corridor in bihar.
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the kosi and gandak river corridor in bihar.
Read moreDesign, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Read moreScanning of package 1 & 2 and finalization of data for intermediate, matric and other examination as per decision of bseb
Scanning of package 1 & 2 and finalization of data for intermediate, matric and other examination as per decision of bseb
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreof your Industry type