Tender Details
About Tender
🛣️ Invitation For Bids: Aunta Simaria Section Nh 31 Road Project 🛣️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Four/Six Laning Of The Aunta Simaria Section Of Nh 31, Including The Construction Of A Railway Over Bridge (Rob) At Km 202.306 (Railway Km 445/27 29) To Address Obstruction Due To Existing Overhead Poles No. 445/29 & 445/30. 📅 Bid Submission Deadline: July 18, 2024, 12:00 Pm Earnest Money Deposit (Emd): Inr 875,000 Interested Bidders Are Requested To Submit Detailed Bids, Including Design, Cost, And Construction Timelines, Adhering To The Specifications Outlined In The Tender Document. Keywords: Nh 31, Aunta Simaria Section, Road Project, Railway Over Bridge, Ministry Of Railways, Central Government, Tender, Bid Submission, Earnest Money DepositParticulars | Details |
---|---|
Title |
(A) Four/Six Laning Of Aunta Simaria (Ganga Bridge With Approach Roads) Section Of Nh 31 From Km 197.900 To Km 206.050 (Design Chainage) (Existing Chainage Km 204.741 To Km 209.945) [Total Design Length 8.15 Km] In State Of Bihar Hybrid Annuity Mode [Package Ii] Obstruction Due Existing Overhead Pole No 445/29 &Amp 445/30 Of Railway For Construction Of Rob 2 At Km. 202306 (Rly. Km 445/27 29) Reg.
(B) Four/Six Laning Of Aunta Simaria (Ganga Bridge With Approach Roads) Section Of Nh 31 Fro
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75878451 |
Reference Number |
TRD-DNR-OT-22-24-25 |
Tender Fee | 0 |
EMD | 87500 |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75878451/viewNitPdf_4618257.pdf |
Start Date | June 26, 2024 00:20 |
End Date |
18/07/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreRehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender at shahpura fee plaza at design km 25.180 for four laning of jabalpur-hiran river section of nh-12 (new nh45) in the state of madhya pradesh
Engagement of user fee agency on the basis of competitive bidding through e-tender at shahpura fee plaza at design km 25.180 for four laning of jabalpur-hiran river section of nh-12 (new nh45) in the state of madhya pradesh
Read more4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
Read moreConstruction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreof your Industry type