🛣️ Invitation For Bids: Aunta Simaria Section Nh 31 Road Project 🛣️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Four/Six Laning Of The Aunta Simaria Section Of Nh 31, Including The Construction Of A Railway Over Bridge (Rob) At Km 202.306 (Railway Km 445/27 29) To Address Obstruction Due To Existing Overhead Poles No. 445/29 & 445/30. 📅 Bid Submission Deadline: July 18, 2024, 12:00 Pm Earnest Money Deposit (Emd): Inr 875,000 Interested Bidders Are Requested To Submit Detailed Bids, Including Design, Cost, And Construction Timelines, Adhering To The Specifications Outlined In The Tender Document. Keywords: Nh 31, Aunta Simaria Section, Road Project, Railway Over Bridge, Ministry Of Railways, Central Government, Tender, Bid Submission, Earnest Money Deposit
Particulars Details
Title
(A) Four/Six Laning Of Aunta Simaria (Ganga Bridge With Approach Roads) Section Of Nh 31 From Km 197.900 To Km 206.050 (Design Chainage) (Existing Chainage Km 204.741 To Km 209.945) [Total Design Length 8.15 Km] In State Of Bihar Hybrid Annuity Mode [Package Ii] Obstruction Due Existing Overhead Pole No 445/29 &Amp 445/30 Of Railway For Construction Of Rob 2 At Km. 202306 (Rly. Km 445/27 29) Reg. (B) Four/Six Laning Of Aunta Simaria (Ganga Bridge With Approach Roads) Section Of Nh 31 Fro
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75878451
Reference
Number
TRD-DNR-OT-22-24-25
Tender Fee 0
EMD 87500
Tender Value
Place Hazipur
Link https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75878451/viewNitPdf_4618257.pdf
Start Date June 26, 2024 00:20
End Date

18/07/2024 ( Expired 304 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode

Read more
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Read more
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh

Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh

Read more
Engagement of user fee agency on the basis of competitive bidding through e-tender at shahpura fee plaza at design km 25.180 for four laning of jabalpur-hiran river section of nh-12 (new nh45) in the state of madhya pradesh

Engagement of user fee agency on the basis of competitive bidding through e-tender at shahpura fee plaza at design km 25.180 for four laning of jabalpur-hiran river section of nh-12 (new nh45) in the state of madhya pradesh

Read more
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).

4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).

Read more
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Read more
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Read more