Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ae Services During Oand M Period For Four Laning Of Bakhtiyarpur Mokama Section Of Nh 31 From Km 153.300 To Km 197.900 (Design Chainage) And (Existing Chainage Km 153.300 To Km 204.741 Of Nh 31), Total Design Length 44.6 Km In The State Of Bihar.
|
| Description |
A E Services During Oand M Period For Four Laning Of Bakhtiyarpur Mokama Section Of Nh 31 From Km 153.300 To Km 197.900 (Design Chainage) And (Existing Chainage Km 153.300 To Km 204.741 Of Nh 31), Total Design Length 44.6 Km In The State Of Bihar
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_170951_1 |
|
Reference Number |
NIT No- 221/RO-PATNA/NHAI/2023-24 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | 0 |
| Place | NHAI, RO - Patna |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | October 16, 2023 19:40 |
| End Date |
Expired
23/11/2023
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRoutine maintenance and incident management of two laning with paved shoulders of bihar sharif- barbigha- mokama section of nh-82 from design chainage km. 94.478 (existing chainage km. 119.320 of nh-31) to km. 149.053 (existing chainage km. 149.000 o
Routine maintenance and incident management of two laning with paved shoulders of bihar sharif- barbigha- mokama section of nh-82 from design chainage km. 94.478 (existing chainage km. 119.320 of nh-31) to km. 149.053 (existing chainage km. 149.000
Read moreIndependent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreConsultancy services of authority engineer during oandm period of four laning of koilwar to bhojpur of nh-30 , 84 chainage km. 33.250 to km. 77.100) length- 43.850 km.) and four laning of bhojpur to buxar section chainage from km. 77.100 to km. 125.
Consultancy services of authority engineer during oandm period of four laning of koilwar to bhojpur of nh-30 an 84 chainage km. 33.250 to km. 77.100) length- 43.850 km.) and four laning of bhojpur to buxar section chainage from km. 77.100 to km. 125
Read moreof your Industry type