Tender Details
Particulars | Details |
---|---|
Title |
Collection Of Samples From Different Points Of Washery Such As Raw Coal, Washed Coal, Washed Power Coal From Running Belts And Carrying And Preparation Of The Same At Laboratory For Further Testing Along With Disposal Of Discarded Samples
|
Description |
Collection Of Samples From Different Points Of Washery Such As Raw Coal, Washed Coal, Washed Power Coal From Running Belts And Carrying And Preparation Of The Same At Laboratory For Further Testing Along With Disposal Of Discarded Samples
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_329299_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1630 |
Tender Fee | 0 |
EMD | 5100 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341320 |
Start Date | February 18, 2025 14:30 |
End Date |
25/02/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps 1 operation circle chemical division annual maintenance work collection preparation testing and reporting of bunker fed coal pulverized coal from mills and bottom ash and fly ash samples mot oil furnace oil hsd oil from of all the units carryin
Nctps 1 operation circle chemical division annual maintenance work collection preparation testing and reporting of bunker fed coal pulverized coal from mills and bottom ash and fly ash samples mot oil furnace oil hsd oil from of all the units carryin
Read moreLaboratory cbr test and atterbergs limits including collection of soil samples from the site and preparation and submission of detailed report
Laboratory cbr test and atterbergs limits including collection of soil samples from the site and preparation and submission of detailed report
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreRepairing/ replacement of water spray system and their pipelines at different coal transfer points of raw coal section of belt conveyor unit 401, 402, 403-a and 403-b at moonidih coal washery.
Repairing/ replacement of water spray system and their pipelines at different coal transfer points of raw coal section of belt conveyor unit 401, 402, 403-a and 403-b at moonidih coal washery.
Read moreCollection n supplying of raw water through water tanker fitted with water pump and water meter of required horse power and dia respectively from the source to water treatment plant at dasarathpur under sd i of cd-i, apwd, rangat as and when require
Collection n supplying of raw water through water tanker fitted with water pump and water meter of required horse power and dia respectively from the source to water treatment plant at dasarathpur under sd i of cd-i, apwd, rangat as and when require
Read moreDismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery
Dismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery
Read moreCollection of samples from different points of washery such as raw coal, washed coal, washed power coal from running belts and carrying and preparation of the same at laboratory for further testing along with disposal of discarded samples
Collection of samples from different points of washery such as raw coal, washed coal, washed power coal from running belts and carrying and preparation of the same at laboratory for further testing along with disposal of discarded samples
Read moreCollection and supplying of raw water from different sources at shaheed dweep by truck tractor and supplying to tanks drums of individual during peak summer as and when required under sd-vi, cd-i, a.p.w.d., sri vijaya puram
Collection and supplying of raw water from different sources at shaheed dweep by truck tractor and supplying to tanks drums of individual during peak summer as and when required under sd-vi, cd-i, a.p.w.d., sri vijaya puram
Read moreof your Industry type