Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For (Ae) For Supervision Of Construction Of Shohratgarh Bypass (Design Length 6.273 Km) To 2lane With Paved Shoulder On Nh 730 S Near Ch. 413.700 And Ends Near Ch. 419.000) Under Epc Mode In The State Of Up.
|
| Description |
Consultancy Services For (Ae) For Supervision Of Construction Of Shohratgarh Bypass (Design Length 6.273 Km) To 2lane With Paved Shoulder On Nh 730 S Near Ch. 413.700 And Ends Near Ch. 419.000) Under Epc Mode In The State Of Up.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_812016_1 |
|
Reference Number |
1035/08Com- NH Circle/24 Date.11.06.2024 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | SIDDHARTHNAGAR |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=853368 |
| Start Date | June 15, 2024 14:30 |
| End Date |
Expired
10/07/2024
Expired 825 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreSelection of authoritys engineer (ae) for supervision of construction of shohratgarh bypass (design length 6.273 km) to two lane with paved shoulder on nh-730 (starts near ch. 413.700 and ends near ch. 419.000) under epc mode in the state of u.p.
Selection of authoritys engineer (ae) for supervision of construction of shohratgarh bypass (design length 6.273 km) to two lane with paved shoulder on nh-730 (starts near ch. 413.700 and ends near ch. 419.000) under epc mode in the state of u.p.
Read moreWidening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71
Widening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71
Read moreWidening to 2lane with paved shoulder configuration of jalna to pulgaon
Widening to 2lane with paved shoulder configuration of jalna to pulgaon
 section existing ch 150.000 to 186.000 nh753c in the state of maharashtra (pkg.04 from 150.000 to 186.000)
Read moreCs for preparation of dpr for widening of exist 2lane with paved shoulder to 4lane with paved shoulder from km 0.00 sitarganj to km 52.200 tanakpur of nh125 new nh 09 in uttarakhand.
Cs for preparation of dpr for widening of exist 2lane with paved shoulder to 4lane with paved shoulder from km 0.00 sitarganj to km 52.200 tanakpur of nh125 new nh 09 in uttarakhand.
Read moreof your Industry type