Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services 200141756 Contract For Ipt Lp Turbine Overhauling And Associated Works Of
|
| Description |
|
| Organisation | NA | Ministry of Power |
| Tender Id | GEM/2025/B/6082543 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 24, 2025 23:23 |
| End Date |
Expired
05/04/2025
Expired 557 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | BISWAS ENGINEERING & CONSTRUCTION SERVICES | 04-04-2025 17:39:31 | Central / State PSUs | MSE | Qualified |
| 2 | E M SERVICES (INDIA) PRIVATE LIMITED | 05-04-2025 11:33:01 | Registered with designated Agency / Authority | MSE | Qualified |
| 3 | ECO POWER SERVICES | 02-04-2025 18:16:53 | Central / State PSUs | MSE | Qualified |
| 4 | INDWELL CONSTRUCTIONS PRIVATE LIMITED | 03-04-2025 12:58:27 | Offline upload | N/A | Qualified |
| 5 | POWER MECH PROJECTS LIMITED | 02-04-2025 15:09:26 | Turnover >= 500 Cr. | N/A | Qualified |
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Read moreSupply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps
Supply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreTtps es circle mrt ii annual overhauling works in respect of turbine auxiliaries system in unit iv annual overhauling period for the year 2026 27
Ttps es circle mrt ii annual overhauling works in respect of turbine auxiliaries system in unit iv annual overhauling period for the year 2026 27
Read moreTtps es circle mrt ii annual overhauling works in respect of turbine auxiliaries system in unit v annual overhauling period for the year 2026 27
Ttps es circle mrt ii annual overhauling works in respect of turbine auxiliaries system in unit v annual overhauling period for the year 2026 27
Read moreProcurement of braun make spares for turbine bfp and hydro turbine
Procurement of braun make spares for turbine bfp and hydro turbine speed measuring instruments for stage 2 3 4 5
Read moreTtps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Read moreof your Industry type