Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Lwscz Under Frame Complete 🛠️ The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Has Issued A Tender For The Procurement Of A Complete Under Frame For Lwscz. 🚂 Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications And Submission Guidelines. Bid Submission Deadline: June 12, 2024, 2:15 Pm Earnest Money Deposit (Emd): Inr 20,00,000 No Tender Fee Is Payable. Bidders Must Possess The Requisite Expertise And Comply With All The Terms And Conditions Outlined In The Tender Document. Keywords: Ministry Of Railways, Under Frame, Lwscz, Tender, Government Procurement, Railways Infrastructure| Particulars | Details |
|---|---|
| Title |
Under Frame Complete For Lwscz
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106342480 |
|
Reference Number |
02240043 |
| Tender Fee | 0 |
| EMD | 20 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106342480/viewNitPdf_4567177.pdf |
| Start Date | May 10, 2024 21:22 |
| End Date |
Expired
12/06/2024
Expired 853 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Manufacturing and supply of air frame sections
Manufacturing and supply of air frame sections
Read moreSupply of interactive flat pannel with complete installation in coa bikaner
Supply of interactive flat pannel with complete installation in coa bikaner
Read moreComplete cleaning and waste collection work for all wards in area of municipality phulera
Complete cleaning and waste collection work for all wards in area of municipality phulera
Read moreSupply and installation of prefabricated accommodation cabin container room with attached toilet and kitchen platform complete
Supply and installation of prefabricated accommodation cabin container room with attached toilet and kitchen platform complete
Read moreInsitu complete rewind along with replacement of melted coil with newone of brbcl nabinagar u#2 generator rotor.
Insitu complete rewind along with replacement of melted coil with newone of brbcl nabinagar u#2 generator rotor.
Read moreSupply of one complete set (03 nos.) of hv bushings of rating 245kv, 800a for utilization at ljhep, atmakur
Supply of one complete set (03 nos.) of hv bushings of rating 245kv, 800a for utilization at ljhep, atmakur
Read moreRepairing of wornout grove 24 nos of track roller 12 nos on both side of tarck frame of bd355 dozer ls.no. 12114 of abdkg colliery, bastacolla area ix
Repairing of wornout grove 24 nos of track roller 12 nos on both side of tarck frame of bd355 dozer ls.no. 12114 of abdkg colliery, bastacolla area ix
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreDesign, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismant
Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismantling of existing unit, erection, testing and commissioning of new generator/motor unit at srisailam left bank hydro electric station (slbhes, reversible pumped storage plant), srisailam dam west, nagarkurnool dist., telangana, india.
Read moreComplete overhauling of 02 n0s rear suspension part no-4688680 and o4 nos differential eye of dumper model cat 773 e sl no 880 deployed at amp colliery barora area
Complete overhauling of 02 n0s rear suspension part no-4688680 and o4 nos differential eye of dumper model cat 773 e sl no 880 deployed at amp colliery barora area
Read moreof your Industry type