Tender Details

Particulars Details
Title
General Pwd A1 Quarters Aluva. General Usr Pwd Quarters A1 At Aluva Balance Work And Reconstruction Of Damaged Compound Wall. Work General Electrical Work. General Electrical Work
Description
General Pwd A1 Quarters Aluva. General Usr Pwd Quarters A1 At Aluva Balance Work And Reconstruction Of Damaged Compound Wall. Work General Electrical Work. General Electrical Work
Organisation Government of Kerala
Tender Id 2023_PWD_623246_2
Reference
Number
ESDE(ET)-124/AEE/2023-24
Tender Fee 335
EMD 1056
Tender Value -
Place EDAPPALLY
Link
View Original Tender Notice

https://etenders.kerala.gov.in

Start Date December 20, 2023 20:30
End Date
Expired 03/01/2024

Expired 1012 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 1dsp ar quarter, 1dsp admin quarter, 2ri quarters, 4rsi quarters and 12ar/hc/pc quarters at nirmal. sub work:- construction of compound wall and cc road for quarters at nirmal district

Construction of 1dsp ar quarter, 1dsp admin quarter, 2ri quarters, 4rsi quarters and 12ar/hc/pc quarters at nirmal. sub work:- construction of compound wall and cc road for quarters at nirmal district

Read more
Reconstruction of damaged guide wall of irrigation canal of ooracheruvu kalmalcheruvu (v), garidepally (m), suryapet (d).

Reconstruction of damaged guide wall of irrigation canal of ooracheruvu kalmalcheruvu (v), garidepally (m), suryapet (d).

Read more
Construction of 1 dsp ar quarter, 1dsp admin quarter, 2ri quarters and 4rsi quarters at medak district. sub work:- construction of compound wall and laying of cc road for 8 nos quarters at medak (2nd call)

Construction of 1 dsp ar quarter, 1dsp admin quarter, 2ri quarters and 4rsi quarters at medak district. sub work:- construction of compound wall and laying of cc road for 8 nos quarters at medak (2nd call)

Read more
Dismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv

Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.

Read more
Construction of archaka residential quarters(g+1) and balance work of adyathmika bhavan at sri venkateswara swamy temple in wanaparthy district,est.cost:198.00 lakhs

Construction of archaka residential quarters(g+1) and balance work of adyathmika bhavan at sri venkateswara swamy temple in wanaparthy district,est.cost:198.00 lakhs

Read more
Reconstruction of collapsed & damaged boundary wall at different locations of periphery and strengthening of tilted boundary wall near tali of kajra solar plant, lakhisarai.

Reconstruction of collapsed & damaged boundary wall at different locations of periphery and strengthening of tilted boundary wall near tali of kajra solar plant, lakhisarai.

Read more
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material

Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material & as per tender document

Read more
(i)construction of road median from plot no.550m to ttd temple exit gate near bsnl quarters (ii) laying of cc road m30 grade infront of bsnl quarters (iii) laying of footpath from plot no.550m to ttd temple exit gate (iv) construction of compound wall to bsnl quarters at road no.92, jubilee hills, ward-222, film nagar, cir-36, jubilee hills, khairatabad zone, ghmc (item.no 3)

(i)construction of road median from plot no.550m to ttd temple exit gate near bsnl quarters (ii) laying of cc road m30 grade infront of bsnl quarters (iii) laying of footpath from plot no.550m to ttd temple exit gate (iv) construction of compound wall to bsnl quarters at road no.92, jubilee hills, ward-222, film nagar, cir-36, jubilee hills, khairatabad zone, ghmc (item.no 3)

Read more
Pjp lmc repairs and reconstruction of damaged drops, pipe culverts, lining in dp-7 left main canal of priyadharshini jurala project pebbair and rampur (v) pebbair (m), wanaparthy district. (reserved for waddera or sagara category)

Pjp lmc repairs and reconstruction of damaged drops, pipe culverts, lining in dp-7 left main canal of priyadharshini jurala project pebbair and rampur (v) pebbair (m), wanaparthy district. (reserved for waddera or sagara category)

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise