Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction, Installation, Commissioning Of 1.00 Mld Stp At Bbmb Colony, Ganguwal, Distt. Ropar Based On Conventional Extended Aeration Treatment As Per Dnit Including O And M For A Period Of 60 Months After Stabilization Period Of 3 Months
|
| Description |
Construction, Installation, Commissioning Of 1.00 Mld Stp At Bbmb Colony, Ganguwal, Distt. Ropar Based On Conventional Extended Aeration Treatment As Per Dnit Including O And M For A Period Of 60 Months After Stabilization Period Of 3 Months
|
| Organisation | Government of Punjab |
| Tender Id | 2023_DLG_108848_1 |
|
Reference Number |
33dated08.09.2023(S.No.1) |
| Tender Fee | 1000 |
| EMD | 3 Lakh |
| Tender Value | - |
| Place | Ropar |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in |
| Start Date | September 09, 2023 14:30 |
| End Date |
Expired
03/10/2023
Expired 1106 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDnit for const., install., commissioning of 1.00 mld stp at bbmb colony, ganguwal, distt. ropar based on conventional extended aeration treatment as per dnit including o and m for a period of 60 months after stabilization period of 3 month or more
Dnit for const., install., commissioning of 1.00 mld stp at bbmb colony, ganguwal, distt. ropar based on conventional extended aeration treatment as per dnit including o and m for a period of 60 months after stabilization period of 3 month or more
Read moreConstruction, installation, commissioning of 1.00 mld stp at bbmb colony, ganguwal, distt. ropar based on conventional extended aeration treatment as per dnit including operation and maintenance for a period of 60 months after period of 3 month
Construction, installation, commissioning of 1.00 mld stp at bbmb colony, ganguwal, distt. ropar based on conventional extended aeration treatment as per dnit including operation and maintenance for a period of 60 months after period of 3 month
Read moreConst.,inst.,commissioning of 1 mld stp at ganguwal based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per dnit including oandm of 60 months after stabilization period of 3 months or more.
Const.,inst.,commissioning of 1 mld stp at ganguwal based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per dnit including oandm of 60 months after stabilization period of 3 months or more.
Read moreExt.andaug. of exist.10mldstp ropar to 16mldstp capacity based on any suitable,sus. proven biological works or turnkey basis as per dnit incl. oandm of ext.16mldstp and sumpwell for period of 60 months after stabilization period of 3 month
Ext.andaug. of exist.10mldstp ropar to 16mldstp capacity based on any suitable,sus. proven biological works or turnkey basis as per dnit incl. oandm of ext.16mldstp and sumpwell for period of 60 months after stabilization period of 3 month
Read moreSurvey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
Survey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.&#x0d &#x0d
Read moreHiring of front end loader with 1.00 cubic metre capacity /bob cat machine for a period of 04 months in ndmc area
Repair and maintenance of infrastructure assets in r-iv division during 2025-26.&#x0d &#x0d sub head- hiring of front end loader with 1.00 cubic metre capacity /bob cat machine for a period of 04 months in ndmc area
Read moreConst., install., commissioning of 15 mld stp at kharar town based on open technology includ. other appurtenant works on turnkey basis dnit, including oandm for a period 60 months after stabilization period of 3 months or including dewatering.
Const., install., commissioning of 15 mld stp at kharar town based on open technology includ. other appurtenant works on turnkey basis dnit, including oandm for a period 60 months after stabilization period of 3 months or including dewatering.
Read moreConstruction of mps along with o and m for 60 months, main sewerage scheme and construction of 1.00 mld capacity stp cum 3 kld fstp along with o and m for 60 months after stabilization at nadala town distt. kapurthala under sbm 2.0
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 1.00 mld capacity stp cum 3 kld fstp along with o and m for 60 months after stabilization at nadala town distt. kapurthala under sbm 2.0
Read moreConstruction of mps along with o and m for 60 months, main sewerage scheme and construction of 1.00 mld capacity stp cum 3 kld fstp along with o and m for 60 months after stabilization at nadala town distt. kapurthala under sbm 2.0
Construction of mps along with o and m for 60 months, main sewerage scheme and construction of 1.00 mld capacity stp cum 3 kld fstp along with o and m for 60 months after stabilization at nadala town distt. kapurthala under sbm 2.0
Read moreof your Industry type