Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Academic Science Block 2 (Basement G 10 Upper Floors) Including Rcc Framed Structure With Pt Beams, Finishing Works, Water Supply Sanitary Installations, Internal Electrical Installation And Cable Laying, Firefighting System
|
Description |
Construction Of Academic Science Block 2 (Basement G 10
Upper Floors) Including Rcc Framed Structure With Pt Beams,
Finishing Works, Water Supply And Sanitary Installations, Internal
Electrical Installation And Cable Laying, Firefighting System
|
Organisation | Department of Higher Education | Central Govt. Ministry/Department |
Tender Id | 2024_DoHE_740663_1 |
Reference Number |
IITB/DIPS/ASB2/TENDER/05 |
Tender Fee | 0 |
EMD | 74.47 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1043674 |
Start Date | January 06, 2024 00:00 |
End Date |
29/01/2024 ( Expired 518 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair/maint of external electric system, ug cable, lt panels, street lights, cooling appliances, ro plant and misc electrical works including preventive maintenance of e/m installation electric and water supply installations at dgqa badarpur tkd
Repair/maint of external electric system, ug cable, lt panels, street lights, cooling appliances, ro plant and misc electrical works including preventive maintenance of e/m installation electric and water supply installations at dgqa badarpur tkd
Read moreConstruction of 13 buildings at various locations in india for unified network management system unms, including finishing works, water supply and sanitary installings, electrical installings and cable laying, automatic fire detection and fire
Construction of 13 buildings at various locations in india for unified network management system unms, including finishing works, water supply and sanitary installings, electrical installings and cable laying, automatic fire detection and fire
Read moreConstruction of science building g plus 4 storied at mbb college agartala tripura ground floor only sh building portion including internal water supply sanitary installation works providing internal electrification works for ground floor
Construction of science building g plus 4 storied at mbb college agartala tripura ground floor only sh building portion including internal water supply sanitary installation works providing internal electrification works for ground floor
Read more02/ee(e)/trichy/cpwd/2025-26
Construction of first and second floor (multipurpose hall) over the canteen and dispensary block in the new land for niftem at thajavur sw.1 constructing rcc framed structure (vertical expansion of 2 more floors) i/c internal water supply and sanitary installation, civil ,external service connection, oht without independent staging and dismantling and demolishing of rcc/brick work etc., sw-2 internal electrical installations, power wiring and plugs fire fighting with down comer system, automatic fire alarm system,13 passengers lift 1 m/s with power operated doors, electrical external service connection, lighting conductor, telephone conduits ,sitcs of vrf system i/c indoor/ outdoor units, piping illuminated signages etc., sh providing interactive display ,lt distribution panel, supply and laying of ug cable.
Read more02/eesm(e)/iitped/2025-26
Construction of super specialty block 3 basement ground floor 11 upper floors and helipad on terrace floor in rml hospital complex new delhi including main building works water supply sanitary installation internal electrical installations lifts firefighting system automatic fire alarm system, air-conditioning system advance health care services development and bulk services and bulk services and horticulture works. sh providing vrv type air conditioning in 3 nos. cath labs.
Read moreConstruction of 13 buildings at unms i/c finishing work water supply and sanitary installation, ei and cable laying, afd and fire fighting system, etc. rnc work at teli bagh, lucknow. sh providing submersible pump for sumps in trenches in compound
Construction of 13 buildings at unms i/c finishing work water supply and sanitary installation, ei and cable laying, afd and fire fighting system, etc. rnc work at teli bagh, lucknow. sh providing submersible pump for sumps in trenches in compound
Read moreConstruction of type ii apartments g plus 10, 80 nos including water supply, sanitary installation, internal electrical installations, fire fighting, fire alarm system, lifts and development works at iit kanpur
Construction of type ii apartments g plus 10, 80 nos including water supply, sanitary installation, internal electrical installations, fire fighting, fire alarm system, lifts and development works at iit kanpur
Read moreInternal and external sewerage system internal water supply sanitary installation finishing work and all other works contingent there too in transgender special toilet at judicial court complex mansa block and district mansa
Internal and external sewerage system internal water supply sanitary installation finishing work and all other works contingent there too in transgender special toilet at judicial court complex mansa block and district mansa
Read moreInternal and external sewerage system internal water supply sanitary installation finishing work and all other works contingent there too in transgenderspecial toilet at judicial court complex sardulgarh block sardulgarh district mansa
Internal and external sewerage system internal water supply sanitary installation finishing work and all other works contingent there too in transgenderspecial toilet at judicial court complex sardulgarh block sardulgarh district mansa
Read moreConstruction of amaravati happy nest residential housing project consisting of 1200 apartment units in 12 towers of (g plus 18) floors pattern (including podium and cellar) with sub-structure, rc wall super structure using shear wall technology with alluminum formwork, podium, architectural finishes, internal and external electrical works, plumbing and sanitary works, fire fighting works, providing lifts, dg sets, hvac, security systems, external development, landscaping and lpg etc, on lumpsu
Construction of amaravati happy nest residential housing project consisting of 1200 apartment units in 12 towers of (g plus 18) floors pattern (including podium and cellar) with sub-structure, rc wall super structure using shear wall technology with alluminum formwork, podium, architectural finishes, internal and external electrical works, plumbing and sanitary works, fire fighting works, providing lifts, dg sets, hvac, security systems, external development, landscaping and lpg etc, on lumpsum contract system including three (3) years defect liability period near nelapadu, amaravati, andhra pradesh
Read moreof your Industry type