Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Academic Science Block 2 (Basement G 10 Upper Floors) Including Rcc Framed Structure With Pt Beams, Finishing Works, Water Supply Sanitary Installations, Internal Electrical Installation And Cable Laying, Firefighting System
|
| Description |
Construction Of Academic Science Block 2 (Basement G 10
Upper Floors) Including Rcc Framed Structure With Pt Beams,
Finishing Works, Water Supply And Sanitary Installations, Internal
Electrical Installation And Cable Laying, Firefighting System
|
| Organisation | Department of Higher Education | Central Govt. Ministry/Department |
| Tender Id | 2024_DoHE_740663_1 |
|
Reference Number |
IITB/DIPS/ASB2/TENDER/05 |
| Tender Fee | 0 |
| EMD | 74.47 Lakh |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1043674 |
| Start Date | January 06, 2024 00:00 |
| End Date |
Expired
29/01/2024
Expired 991 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renovation of the ground and first floors and development of basement parking at pt. suryanarayan vyas guest house (harsiddhi dharamshala), ujjain.
Renovation of the ground and first floors and development of basement parking at pt. suryanarayan vyas guest house (harsiddhi dharamshala), ujjain.
Read moreConstruction of academic science block 1 (ground plus 10 upper floors)
Construction of academic science block 1 (ground plus
 10 upper floors) including finishing works, internal
 water supply, sanitary and electrical installations,
 firefighting, fire alarm and elv systems, laboratories,
 lifts,
Read moreConstruction of hostel blocks 12e girls hostel ground plus 12 upper floors plus terrace lmr oht and 14d boys hostel ground podium plus 7 upper floors plusterrace lmr oht including finishing works water supply and sanitary install at iit bombay
Construction of hostel blocks 12e girls hostel ground plus 12 upper floors plus terrace lmr oht and 14d boys hostel ground podium plus 7 upper floors plusterrace lmr oht including finishing works water supply and sanitary install at iit bombay
Read moreEor to ggsss, panama building jama masjid school id 2127023 sh renovation repair of toilet on all floors repairs of beams and columns and finishing other miscellaneous civil works
Eor to ggsss, panama building jama masjid school id 2127023 sh renovation repair of toilet on all floors repairs of beams and columns and finishing other miscellaneous civil works
Read moreProviding maintenance of 102 hig msb flats basement stilt 17 floors at new tower block in t.s.no.3902pt, 3903pt, 3904 pt, 3905 pt 3906 pt, block no.85 of mylapore village taluk in chennai district for the period 16.12.24 to 31.5.25
Providing maintenance of 102 hig msb flats basement stilt 17 floors at new tower block in t.s.no.3902pt, 3903pt, 3904 pt, 3905 pt 3906 pt, block no.85 of mylapore village taluk in chennai district for the period 16.12.24 to 31.5.25
Read moreRevival of incomplete commercial building / multi-level car parking facility (mlcp) to an integrated multiplex and commercial space comprising a basement leve seven upper floors in tirupati (4th call)
Revival of incomplete commercial building / multi-level car parking facility (mlcp) to an integrated multiplex and commercial space, comprising a basement level seven upper floors, in tirupati (4th call)
Read moreConstruction of boys hostel at hindu college comprising of stilt 5 floors for 566 students including structural works, finishing works, internal water supply, sanitary, storm water drainage electrical installations including fire alarm , wi-fi and pa
Construction of boys hostel at hindu college comprising of stilt 5 floors for 566 students including structural works, finishing works, internal water supply, sanitary, storm water drainage electrical installations including fire alarm , wi-fi and pa
Read moreConstruction of boys hostel at hindu college comprising of stilt and 5 floors for 566 students including structural works, finishing works, part internal water supply, part sanitary, part storm water drainage electrical installations including fire a
Construction of boys hostel at hindu college comprising of stilt and 5 floors for 566 students including structural works, finishing works, part internal water supply, part sanitary, part storm water drainage electrical installations including fire a
Read moreof your Industry type