Tender Details

Particulars Details
Title
Construction Of Academic Science Block 2 (Basement G 10 Upper Floors) Including Rcc Framed Structure With Pt Beams, Finishing Works, Water Supply Sanitary Installations, Internal Electrical Installation And Cable Laying, Firefighting System
Description
Construction Of Academic Science Block 2 (Basement G 10&#X0d Upper Floors) Including Rcc Framed Structure With Pt Beams,&#X0d Finishing Works, Water Supply And Sanitary Installations, Internal&#X0d Electrical Installation And Cable Laying, Firefighting System
Organisation Department of Higher Education | Central Govt. Ministry/Department
Tender Id 2024_DoHE_740663_1
Reference
Number
IITB/DIPS/ASB2/TENDER/05
Tender Fee 0
EMD 74.47 Lakh
Tender Value -
Place Mumbai
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1043674

Start Date January 06, 2024 00:00
End Date
Expired 29/01/2024

Expired 991 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Renovation of the ground and first floors and development of basement parking at pt. suryanarayan vyas guest house (harsiddhi dharamshala), ujjain.

Renovation of the ground and first floors and development of basement parking at pt. suryanarayan vyas guest house (harsiddhi dharamshala), ujjain.

Read more
Construction of academic science block 1 (ground plus 10 upper floors)

Construction of academic science block 1 (ground plus&#x0d 10 upper floors) including finishing works, internal&#x0d water supply, sanitary and electrical installations,&#x0d firefighting, fire alarm and elv systems, laboratories,&#x0d lifts,

Read more
Construction of hostel blocks 12e girls hostel ground plus 12 upper floors plus terrace lmr oht and 14d boys hostel ground podium plus 7 upper floors plusterrace lmr oht including finishing works water supply and sanitary install at iit bombay

Construction of hostel blocks 12e girls hostel ground plus 12 upper floors plus terrace lmr oht and 14d boys hostel ground podium plus 7 upper floors plusterrace lmr oht including finishing works water supply and sanitary install at iit bombay

Read more
Eor to ggsss, panama building jama masjid school id 2127023 sh renovation repair of toilet on all floors repairs of beams and columns and finishing other miscellaneous civil works

Eor to ggsss, panama building jama masjid school id 2127023 sh renovation repair of toilet on all floors repairs of beams and columns and finishing other miscellaneous civil works

Read more
Providing maintenance of 102 hig msb flats basement stilt 17 floors at new tower block in t.s.no.3902pt, 3903pt, 3904 pt, 3905 pt 3906 pt, block no.85 of mylapore village taluk in chennai district for the period 16.12.24 to 31.5.25

Providing maintenance of 102 hig msb flats basement stilt 17 floors at new tower block in t.s.no.3902pt, 3903pt, 3904 pt, 3905 pt 3906 pt, block no.85 of mylapore village taluk in chennai district for the period 16.12.24 to 31.5.25

Read more
Revival of incomplete commercial building / multi-level car parking facility (mlcp) to an integrated multiplex and commercial space comprising a basement leve seven upper floors in tirupati (4th call)

Revival of incomplete commercial building / multi-level car parking facility (mlcp) to an integrated multiplex and commercial space, comprising a basement level seven upper floors, in tirupati (4th call)

Read more
Construction of boys hostel at hindu college comprising of stilt 5 floors for 566 students including structural works, finishing works, internal water supply, sanitary, storm water drainage electrical installations including fire alarm , wi-fi and pa

Construction of boys hostel at hindu college comprising of stilt 5 floors for 566 students including structural works, finishing works, internal water supply, sanitary, storm water drainage electrical installations including fire alarm , wi-fi and pa

Read more
Construction of boys hostel at hindu college comprising of stilt and 5 floors for 566 students including structural works, finishing works, part internal water supply, part sanitary, part storm water drainage electrical installations including fire a

Construction of boys hostel at hindu college comprising of stilt and 5 floors for 566 students including structural works, finishing works, part internal water supply, part sanitary, part storm water drainage electrical installations including fire a

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise