Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Median From Transport Nagar Junction To Galta Gate And Sadwa Mode To Pili Ki Talai At Delhi Road, Zone 10, Jda, Jaipur
|
Description |
Construction Of Median From Transport Nagar Junction To Galta Gate And Sadwa Mode To Pili Ki Talai At Delhi Road, Zone 10, Jda, Jaipur
|
Organisation | Jaipur Development Authority | State Govt. and UT |
Tender Id | 2024_JDAJP_422818_1 |
Reference Number |
EE-10/15/2024-25 |
Tender Fee | 3000 |
EMD | 6.09 Lakh |
Tender Value | |
Place | Delhi Road |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=759646 |
Start Date | September 24, 2024 15:05 |
End Date |
03/10/2024 ( Expired 277 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConsultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConstruction of cc road and rcc drain at ward no 32 rakesh raikwar to ramdas soni to arti raikwar house municipal council narmadapuram mp.
Construction of cc road and rcc drain at ward no 32 rakesh raikwar to ramdas soni to arti raikwar house municipal council narmadapuram mp.
Read moreof your Industry type