Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing, Installation, Testing And Commissioning Of Off Grid Battery Backup Solar Power Plant 2 Kw At Bankat Pump Canal In Block Karwi District Chitrakoot
|
Description |
Providing, Installation, Testing And Commissioning Of Off Grid Battery Backup Solar Power Plant 2 Kw At Bankat Pump Canal In Block Karwi District Chitrakoot
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2025_UPIDM_1010542_1 |
Reference Number |
15/Lot6/MLCDBanda/2024-25 |
Tender Fee | 854 |
EMD | 5700 |
Tender Value | |
Place | Bankat, Chitrakoot |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1813276 |
Start Date | February 24, 2025 17:30 |
End Date |
03/03/2025 ( Expired 105 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of grid-interactive rooftop solar pv systems with battery backup in hospitals under national health mission, assam
Installation of grid-interactive rooftop solar pv systems with battery backup in hospitals under national health mission, assam
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at kotha guru, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at kotha guru, district bathinda, punjab under amrut 2.0 scheme
Read moreProviding installation testing and commissioning of 25 kwp off grid solar power plant at bops sherpur ghoga and fatehpur of 183 bn bops chhanmulla fwd kakkar and rear kakkar of 22 bn bops daoke kahangarh rajatal mahwa of 144 bn bops mohinder n/dhall
Providing installation testing and commissioning of 25 kwp off grid solar power plant at bops sherpur ghoga and fatehpur of 183 bn bops chhanmulla fwd kakkar and rear kakkar of 22 bn bops daoke kahangarh rajatal mahwa of 144 bn bops mohinder n/dhall
Read moreSupply installation testing commissioning of 700 kwp grid tied rooftop solar pv system and five year maintenance
Supply installation testing commissioning of 700 kwp grid tied rooftop solar pv system and five-year maintenance
Read moreDesign, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Design, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Read moreSupply, installation, testing and commissioning of resilient seated cast iron kinetic type air relief valves in domestic pipelines at various locations in anushaktinagar, mumbai.
Supply, installation, testing and commissioning of resilient seated cast iron kinetic type air relief valves in domestic pipelines at various locations in anushaktinagar, mumbai.
Read moreSupply, installation, testing and commissioning of grid connected rooftop and ground mounted solar power plants on government buildings
Supply, installation, testing and commissioning of grid connected rooftop and ground mounted solar power plants on government buildings
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning of total 216 nos of 9-mtr solar led high mast at various locations in nagpur district in the state of maharashtra with five years comprehensive maintenance contract (cmc)
Survey, design, fabrication, supply, installation, testing, commissioning of total 216 nos of 9-mtr solar led high mast at various locations in nagpur district in the state of maharashtra with five years comprehensive maintenance contract (cmc)
Read moreConstruction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)
Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreof your Industry type