Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Umarkhed To Lakhara Road Including Cd Works Vr 50 Km.0/00 To 1/00 Tq.Morshi Distt.Amravati.
|
Description |
Improvement To Umarkhed To Lakhara Road Including Cd Works Vr 50 Km.0/00 To 1/00 Tq.Morshi Distt.Amravati.
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_989619_1 |
Reference Number |
PWD/AMT/2023-24/57/14 |
Tender Fee | 1180 |
EMD | 82000 |
Tender Value | |
Place | Amravati. |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1729062 |
Start Date | January 24, 2024 15:30 |
End Date |
31/01/2024 ( Expired 493 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreAAAAAAAAAA
Login to viewAppointment of safety consultant for improvement to 4 lane with paved shoulder for package-1 of silchar- jiribam road in the state of assam on ham mode (length- 20.00 km)
Read moreAAAAAAAAAA
Login to viewAppointment of safety consultant for widening/improvement to 4 lane with paved shoulder for package-1 of silchar- churaibari road in the state of assam on ham mode (length- 15.97 km)
Read moreAAAAAAAAAA
Login to viewAppointment of safety consultant for widening/improvement to 4 lane with paved shoulder for package-1 of bilasipura- guwahati road in the state of assam on ham mode (length- 17.74 km)
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreWidening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Widening strengthening of g.t. road to bara pind dhuleta masani upto phagwara dosanjh mukandpur banga phillaur road km 0.00 to 16.10km 16.10 km jodr09 under 5054 rb10 pci 2 including maintenance of road for 5 years 1 year defect liability period 4 yr
Read moreof your Industry type