Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cc Road Along With Drain At Hanumangarh Padampur Road (Binjhbayla Village) Km. 56/0 To 58/0
|
| Description |
Construction Of Cc Road Along With Drain At Hanumangarh Padampur Road (Binjhbayla Village) Km. 56/0 To 58/0
|
| Organisation | PWD - CE AND AS | State Govt. and UT |
| Tender Id | 2024_CEPWD_429476_1 |
|
Reference Number |
NIT13_SGNR_Budget_PDP |
| Tender Fee | 7500 |
| EMD | 12.09 Lakh |
| Tender Value | - |
| Place | Sri Ganganagar |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=772361 |
| Start Date | October 28, 2024 23:00 |
| End Date |
Expired
12/11/2024
Expired 703 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Laying of distribution water supply pipe line in newly developed areas under different wards of kataka municipal corporation (ward no.56, 57, 58 and 59)
Laying of distribution water supply pipe line in newly developed areas under different wards of kataka municipal corporation (ward no.56, 57, 58 and 59)
Read moreDevelopment of footpath work with plantation from passport office to 56 bogh sweets along the pal road in zone 2
Development of footpath work with plantation from passport office to 56 bogh sweets along the pal road in zone 2
Read moreLocator body 0(ak-630.101-41) casting to drg. no. ak-630.101-41 to spcn grade 2b to is: 10343-89(castin,plate to drg. no. ak-630 102-58 in f/c,panel to drg. no. ak-630 101-56 in f/c
Locator body 0(ak-630.101-41) casting to drg. no. ak-630.101-41 to spcn grade 2b to is: 10343-89(castin,plate to drg. no. ak-630 102-58 in f/c,panel to drg. no. ak-630 101-56 in f/c
Read moreTender no.(03) ward no.58 51 55 44 47 35 57 36 46 49 56 avam anya wardo me hotmix plant dwara pakka patch marmmat ka karya.
Tender no.(03) ward no.58 51 55 44 47 35 57 36 46 49 56 avam anya wardo me hotmix plant dwara pakka patch marmmat ka karya.
Read moreRaising of medium level pf no. 1 at gajsinghpur over bikaner division along with extension from 495 m to 580 m & 3 m wide fob under aden/hanumangarh-ii
Raising of medium level pf no. 1 at gajsinghpur over bikaner division along with extension from 495 m to 580 m & 3 m wide fob under aden/hanumangarh-ii
Read moreRoad safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at barekhan fanta and dholapani (ch. 27/500 and 44/500), and slope stabilization from ch. 84/0 to 85/0 on nh-56
Road safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at barekhan fanta and dholapani (ch. 27/500 and 44/500), and slope stabilization from ch. 84/0 to 85/0 on nh-56
Read moreRestoration of rain damages onkalhel chatri jungrar road km 0/0 to 7/0 (sh c/o bed plate dirt wall wheel guard railing sabl etc. of 3.00 mtr span culvert at rd 3/380 and5/305 along with wing walls)
Restoration of rain damages onkalhel chatri jungrar road km 0/0 to 7/0 (sh c/o bed plate dirt wall wheel guard railing sabl etc. of 3.00 mtr span culvert at rd 3/380 and5/305 along with wing walls)
Read moreRepair and restoration of damaged retaining wall from rd 0 to rd 7000 m at various spots along boulevard road srinagar (phase-i).
Repair and restoration of damaged retaining wall from rd 0 to rd 7000 m at various spots along boulevard road srinagar (phase-i).
Read moreUltraporous acetabular shell with compatible crosslinked polyethylene liner with two screw (size 44/,revision acetabular cup with ischial flange/peripheral rim screws (to include 08 screws) /(size 56/58,posterior stabilised knee consisting of: cobalt chromium femoral component matching highly crosslin
Ultraporous acetabular shell with compatible crosslinked polyethylene liner with two screw (size 44/,revision acetabular cup with ischial flange/peripheral rim screws (to include 08 screws) /(size 56/58,posterior stabilised knee consisting of: cobalt chromium femoral component matching highly crosslin
Read moreLaying of riser main pipe from rd 0 to 1829 along with distribution pipeline for kapuri lift scheme off taking from rd 152340/l of narwana branch
Laying of riser main pipe from rd 0 to 1829 along with distribution pipeline for kapuri lift scheme off taking from rd 152340/l of narwana branch
Read moreof your Industry type