Tender Details
Particulars | Details |
---|---|
Title |
Underground Water Supply Main Line From Pump Head Room To Supply Line For 180 Nos. Quarter, Change Of 40 Mm Vertical Water Supply Line For 08 Nos. Quarters From Ground To Overhead Water Tank And Over Flow Line, Replacement Of Supply Line
|
Description |
Underground Water Supply Main Line&Amp#X0d
From Pump Head Room To Supply Line&Amp#X0d
For 180 Nos. Quarter, Change Of 40&Amp#X0d
Mm Vertical Water Supply Line For 08&Amp#X0d
Nos. Quarters From Ground To&Amp#X0d
Overhead Water Tank And Over Flow&Amp#X0d
Line, Replacement Of Supply Line
|
Organisation | HOUSING DIRECTORATE | State Govt. and UT |
Tender Id | 2024_HSD_721791_1 |
Reference Number |
WBHOUSING_EE_SILIGURI_eNIT- 05 |
Tender Fee | 0 |
EMD | 11845 |
Tender Value | |
Place | R.H.E. Rajbari Para, Jalpaiguri. |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1589232 |
Start Date | July 25, 2024 23:30 |
End Date |
05/08/2024 ( Expired 290 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Replacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Read moreNctpsi semii circle ahp dn breakdown routine maintenance of recovery water line no2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period from the handing over of site to 31 03 2026
Nctpsi semii circle ahp dn breakdown routine maintenance of recovery water line no2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period from the handing over of site to 31 03 2026
Read moreReplacement of blockage water supply pipe line including fittings for big studio and construction of cc road for connection of pump room, deep tube well etc to main road at srfti, kolkata
Replacement of blockage water supply pipe line including fittings for big studio and construction of cc road for connection of pump room, deep tube well etc to main road at srfti, kolkata
Read moreShifting of water supply pipe line, pump machinery and hand pump due to road widening work from badgaon to kavita main road. 1008
Shifting of water supply pipe line, pump machinery and hand pump due to road widening work from badgaon to kavita main road. 1008
Read moreStringing of two nos. of 33kv overhead transmission line for providing power supply from bina main switching substation to substation a of madhucon construction at bina project (ncl)
Stringing of two nos. of 33kv overhead transmission line for providing power supply from bina main switching substation to substation a of madhucon construction at bina project (ncl)
Read moreReplacement of 100 mm and 150 mm dia of ductile iron (di) isi market k-9 grade water supply line from sai baba mandir to hewo chowk sector-16a in ward no 31 , old faridabad
Replacement of 100 mm and 150 mm dia of ductile iron (di) isi market k-9 grade water supply line from sai baba mandir to hewo chowk sector-16a in ward no 31 , old faridabad
Read moreRepair and replacement of water supply line
Repair and replacement of water supply line of old/rusted and damaged gi pipe line of type-ii quarter no, 2001 to 2420 total 420 nos quarters (28 block) of b block at group centre avadi chennai
Read moreConstruction work of 3 nos. of overhead tank, rising main and water supply line of 500 kl 20 m staging proposed in transport nagar yojana.
Construction work of 3 nos. of overhead tank, rising main and water supply line of 500 kl 20 m staging proposed in transport nagar yojana.
Read moreShifting of 800mm dia. water supply pumping main with 800mm dia. di k9 pipe line from arunodaya nagar sundaramma dibba to singh nagar fly-over including budameru canal crossing. general funds rc.e11-101740/2025 (2nd call)
Shifting of 800mm dia. water supply pumping main with 800mm dia. di k9 pipe line from arunodaya nagar sundaramma dibba to singh nagar fly-over including budameru canal crossing. general funds rc.e11-101740/2025 (2nd call)
Read moreReplacement of water supply pumping main from kodayanchi head work to ramayanthoppu booster station to vaniyambadimunicipality tirupathur district
Replacement of water supply pumping main from kodayanchi head work to ramayanthoppu booster station to vaniyambadimunicipality tirupathur district
Read moreof your Industry type