Tender Details

Particulars Details
Title
Construction Cm Model Composite School (Phase 2) At Block Rudhauli Village Tikarria Pappa Distt. Basti
Description
Construction Cm Model Composite School (Phase 2) At Block Rudhauli Village Tikarria Pappa Distt. Basti
Organisation U.P. Projects Corporation Ltd. | State Govt. and UT
Tender Id 2026_UPPRC_1136333_1
Reference
Number
01/GM-3/UPPCL/2026-27 DATE-06.04.2026
Tender Fee 17700
EMD 44.72 Lakh
Tender Value -
Place Basti
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2121933

Start Date April 13, 2026 22:30
End Date
Expired 24/04/2026

Expired 174 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Replacement of composite insulators by porcelain insulators over ckp division.(phase-ii).

Replacement of composite insulators by porcelain insulators over ckp division.(phase-ii).

Read more
Comprehensive annual maintenance contract of m/s abb make composite converter of three phase locomotives (wap-5)

Comprehensive annual maintenance contract of m/s abb make composite converter of three phase locomotives (wap-5)

Read more
Deposit-construction of international hostel block at kila-thaliparamba campus (phase -1)-kila -international hostel-composite work-1

The provisions included in this phase comprise site levelling, foundation works, plinth filling, and concrete works up to the ground floor level only(upto grid m).

Read more
Lac -ads- lac- ads-2022-2023,2023-2024- adv. sri.sebastian kulathunkal mla- poonjar lac-construction of mini civil station at mundakayam-work 1st phase-composite work-1-(phase-1)

Ground floor and first floor works consist of rcc framed structure with footing, column, plinth beam, beam, slab, staircase, etc . solid block , aac block masonry, heavy-duty vitrified tiled flooring,upvc windows, and all finishing works.

Read more
Construction work of c.m. model composite school pre primary to class 12th at village harnathpur kota block simbhavli in district hapur

Construction work of c.m. model composite school pre primary to class 12th at village harnathpur kota block simbhavli in district hapur

Read more
Dry vacuum pump, model- epx180le, 400vac, 3-phase, 3/8 quick connectors, edward p/n- a41943014

Dry vacuum pump, model- epx180le, 400vac, 3-phase, 3/8 quick connectors, edward p/n- a41943014

Read more
Camc/comprehensive repair/ renewal for m/s abb make composite propulsion system in 3 phase electric locomotives of hwhe for three years

Camc/comprehensive repair/ renewal for m/s abb make composite propulsion system in 3 phase electric locomotives of hwhe for three years

Read more
3 phase 2hp self-priming non-clog coupled mono block pump model: sp 1h 2c2, make: kirloskar

3 phase 2hp self-priming non-clog coupled mono block pump model: sp 1h 2c2, make: kirloskar

Read more
P/l interlocking tiles in purana thana road, patiala street, hazi rattan street, court road, kacha dhobiana, mig quarter, bhagu road, model town phase 1 to 5, amrik singh road, santpura road, nai basti, ahata niaz mohd., ganesh nagar, namdev road,

P/l interlocking tiles in purana thana road, patiala street, hazi rattan street, court road, kacha dhobiana, mig quarter, bhagu road, model town phase 1 to 5, amrik singh road, santpura road, nai basti, ahata niaz mohd., ganesh nagar, namdev road,

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise