Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Fixing Direction Boards In The Jurisdiction Of Saligao Calangute An Aldona Constituencies To Achieve Smooth Traffic Circulation During Construction Of Elevated Corridor From Km 508.000 To Km 513.150 Including Approaches On Nh 66 In The
|
Description |
Providing And Fixing Direction Boards In The Jurisdiction Of Saligao Calangute An Aldona Constituencies To Achieve Smooth Traffic Circulation During Construction Of Elevated Corridor From Km 508.000 To Km 513.150 Including Approaches On Nh 66 In The
|
Organisation | Government of Goa |
Tender Id | 2023_PWD_12847_1 |
Reference Number |
2023-24/PWD/WDVII(NH)/ASW/31 |
Tender Fee | 4000 |
EMD | 95913 |
Tender Value | |
Place | EE WD VII, PWD, Panaji |
Link | https://eprocure.goa.gov.in |
Start Date | December 08, 2023 18:40 |
End Date |
15/12/2023 ( Expired 555 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)
Const. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Read moreShort term maintenance of elevated structure including approaches from km. 352.675 to km. 354.430 and vup at km. 355.400 including approaches on nh-44 (old nh-1) at phagwara city in the state of punjab (2nd call).
Short term maintenance of elevated structure including approaches from km. 352.675 to km. 354.430 and vup at km. 355.400 including approaches on nh-44 (old nh-1) at phagwara city in the state of punjab (2nd call).
Read more4-laning from end of zuari approaches to start of margao bypass section of nh 66 from km.536.800 to km.543.450 on epc mode in the state of goa under annual plan 2024-25.
4-laning from end of zuari approaches to start of margao bypass section of nh 66 from km.536.800 to km.543.450 on epc mode in the state of goa under annual plan 2024-25.
Read moreConstruction of 6 lane elevated corridor including its approaches from km. 629.880 to km. 634.470 (design chainage) of nh16 in ranasthalam town portion in the state of andhra pradesh under nh(o) on epc mode
Construction of 6 lane elevated corridor including its approaches from km. 629.880 to km. 634.470 (design chainage) of nh16 in ranasthalam town portion in the state of andhra pradesh under nh(o) on epc mode
Read moreRfp for procurement of services of authoritys engineer for 4_laning from end of zuari approaches to start of margao bypass section of nh 66 from km.536.800 to km.543.450 on epc mode in the state of goa under annual plan 2024_25
Rfp for procurement of services of authoritys engineer for 4_laning from end of zuari approaches to start of margao bypass section of nh 66 from km.536.800 to km.543.450 on epc mode in the state of goa under annual plan 2024_25
Read moreUp-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (from km. 0.000 to km. 25.000 (design length 25.000 km)) in maharashtra to be d on bot (toll)mode (pkg-1)
Up-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (from km. 0.000 to km. 25.000 (design length 25.000 km)) in maharashtra to be d on bot (toll)mode (pkg-1)
Read moreof your Industry type