Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Six Lane Elevated Corridor From Km 508.000 To Km 513.150
|
| Description |
Construction Of Six Lane Elevated Corridor From Km. 508.000 To Km. 513.150
Including Approaches On Nh 66 In The State Of Goa On Epc Mode.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_752196_1 |
|
Reference Number |
RO/MUM/TENDER/2023-24/01 |
| Tender Fee | 0 |
| EMD | 4.75 Crore |
| Tender Value | - |
| Place | CE-RO,MoRTH,Konkan Bhawan,CBD Belapur,Navi Mumbai |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | June 15, 2023 14:30 |
| End Date |
Expired
10/07/2023
Expired 1171 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreProviding bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Providing bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Read more1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read moreGodavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreof your Industry type