Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Tender Announcement: Cleaning Of Condenser Cooling Water Inlet Lines 🚫🚪 Tneb Limited, A State Government Undertaking, Invites Bids For The Cleaning Of Condenser Cooling Water Inlet Lines From Manhole 3 To Manhole Within The Premises Of Nctps Ii, Se Mi, Under The Supervision Of The Maintenance In Charge (Ca Cwph, Unit I). 📅 Bid Submission Deadline: July 15, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 3300 Interested Contractors Must Possess The Necessary Equipment And Expertise To Perform The Task Efficiently And Safely. Detailed Proposals, Including Methodology, Safety Measures, And Cost Estimates, Are To Be Submitted By The Stipulated Deadline. Keywords: Tneb Limited, Cleaning Services, Condenser Cooling Water, State Govt. And Ut, Tender, Bid Submission, Emd, Manhole, Nctps Ii, Se Mi| Particulars | Details |
|---|---|
| Title |
Nctps Ii Mi Circle Ca Cwph Unit I Cleaning Of Condenser Cooling Water Inlet Lines From Manhole 3 To Manhole
|
| Description |
Nctps Ii Mi Circle Ca Cwph Unit I Cleaning Of Condenser Cooling Water Inlet Lines From Manhole 3 To Manhole
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_458356_1 |
|
Reference Number |
SE MI NCTPS II O M 91 24 25 |
| Tender Fee | 0 |
| EMD | 3300 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=544893 |
| Start Date | June 29, 2024 19:30 |
| End Date |
Expired
15/07/2024
Expired 823 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i se mi circle boiler maintenance division specification no 305 25 26
Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system
Read moreTtps operation circle cad cwph i unit iii annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of unit iii
Ttps operation circle cad cwph i unit iii annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of unit iii
Read moreTtps operation circle cad acwph unit iii a.c.w system annual overhauling of valves, strainers and nrvs of a.c.w pumps and inlet and outlet valves of cooling tower
Ttps operation circle cad acwph unit iii a.c.w system annual overhauling of valves, strainers and nrvs of a.c.w pumps and inlet and outlet valves of cooling tower
Read moreTtps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Read moreTtps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Ttps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Read moreNctps i se m ii circle ahp dn breakdown routine maintenance of recovery water lines no 2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period of one year from the date of taken over of site
Nctps i se m ii circle ahp dn breakdown routine maintenance of recovery water lines no 2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period of one year from the date of taken over of site
Read moreNctps ii mi circle ca cwph unit i cleaning of condenser cooling water inlet lines
Nctps ii mi circle ca cwph unit i cleaning of condenser cooling water inlet lines
Read moreNctps ii mi circle ca cwph unit i cleaning of condenser cooling water inlet lines
Nctps ii mi circle ca cwph unit i cleaning of condenser cooling water inlet lines
Read moreof your Industry type