Particulars | Details |
---|---|
Title |
Fabrication And Fitting Of Four Nos Load V Scrapper At 1200mm Wide Spreader Belt Discharge Point To Increase Coal Stock Of Mic, Jhanjra Project Colliery
|
Description |
Fabrication And Fitting Of Four Nos Load V Scrapper At 1200mm Wide Spreader Belt Discharge Point To Increase Coal Stock Of Mic, Jhanjra Project Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2700 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link |
AAAAAAAAAA Login to view |
Start Date | June 21, 2025 16:30 |
End Date |
01/07/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying and erection of 2 length of 50 mm heavy duty pe 8o pipe for water supply to coal stock for fire fighting purpose from banwar pipe point at topa ocp under kuja area.
Laying and erection of 2 length of 50 mm heavy duty pe 8o pipe for water supply to coal stock for fire fighting purpose from banwar pipe point at topa ocp under kuja area.
Read moreFabrication and fitting of four nos load v-scrapper at 1200mm wide spreader belt discharge point to increase coal stock of mic, jhanjra project colliery
Fabrication and fitting of four nos load v-scrapper at 1200mm wide spreader belt discharge point to increase coal stock of mic, jhanjra project colliery
Read moreFabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Read moreReplacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Replacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Read moreVulcanizing joint of 1200 mm wide steel cord belt type st 2500 by f.r. grade rubber and bonding materials at mic, jhanjra project colliery under jhanjra area
Vulcanizing joint of 1200 mm wide steel cord belt type st 2500 by f.r. grade rubber and bonding materials at mic, jhanjra project colliery under jhanjra area
Read moreShifting of latice mast from dakra coal stock to new loaction under dakra ocp, laying of ofc from nearest wan point at pm 10 analyzer room at dakra and kdh respectively also for rohini d1 and providing of 10 nos. lan connection for access of sap, e-o
Shifting of latice mast from dakra coal stock to new loaction under dakra ocp, laying of ofc from nearest wan point at pm 10 analyzer room at dakra and kdh respectively also for rohini d1 and providing of 10 nos. lan connection for access of sap, e-o
Read moreHeightening of t3 and t4 belt conveyor along -2l. in rvi and rv seam including necessary fabrication jobs and required alignment alongwith change of 1200mm 200m belt at mic jpc.
Heightening of t3 and t4 belt conveyor along -2l. in rvi and rv seam including necessary fabrication jobs and required alignment along with change of 1200mm 200m belt at mic jpc.
Read moreTransportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreTransportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Read moreLaying of water supply pipeline from tanker filling point near coal stock 44 to coal stock 43 44 and 45 at sec 2 under rocp
Laying of water supply pipeline from tanker filling point near coal stock 44 to coal stock 43 44 and 45 at sec 2 under rocp
Read moreof your Industry type