Particulars | Details |
---|---|
Title |
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Jaswantgarh Fp At Km. 64.200 For Jaswantgarh Debari Section From Km 57.000 To Km. 104.724 Of Nh 76 In Rajasthan
|
Description |
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Jaswantgarh Fp At Km. 64.200 For Jaswantgarh Debari Section From Km 57.000 To Km. 104.724 Of Nh 76 In Rajasthan
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_210656_1 |
Reference Number |
NHAI/13013/547/CO/ 24-25/CB/ Jaswantgarh FP |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=230671 |
Start Date | October 08, 2024 17:30 |
End Date |
21/10/2024 ( Expired 260 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreConsultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c
Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreReconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis
Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis
Read moreBalance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Balance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreMajor maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis
Major maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis
Read moreAnnual maintenance including incident management of two laning with paved shoulder of dindigul-theni-kumili section from km 2.750 to km 136.543 of nh-183 in the state of tamil nadu on item rate basis
Annual maintenance including incident management of two laning with paved shoulder of dindigul-theni-kumili section from km 2.750 to km 136.543 of nh-183 in the state of tamil nadu on item rate basis
Read moreof your Industry type