Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/Ws/Grww/Ph I/E T 09/2024 25
|
| Description |
Supply And Laying Of New Cable With Supply, &Amp#X0d
Fitting And Fixing Of New Led Light Fittings &Amp#X0d
Against Damaged One Approach Road Lighting &Amp#X0d
From Zero Gate No 1 To Ph Ii Pump House Within &Amp#X0d
Grww Campus.
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2024_KMC_766830_1 |
|
Reference Number |
KMC/WS/GRWW/PH-I/eT-09/2024-25 |
| Tender Fee | 0 |
| EMD | 5550 |
| Tender Value | - |
| Place | GRWW |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1697995 |
| Start Date | November 06, 2024 19:30 |
| End Date |
Expired
18/11/2024
Expired 695 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, fitting and fixing of new taper roller bearing in place of defective one inside the tbh of the kbl make v.t. pump no-1 along with reassembly and alignment at the low lift pumping station under grww.
Read moreApplication of corrosion resistant primer and epoxy resin based painting on two nos. ss grid pipe lines, by pass arrangement, valves, platform etc. and ms structure of inter connection valves shed on the western side of plm room under grww.
Read moreReplacement of defective spares with new ones suitable for the existing v.t. pump no-4 including reassembling and alignment of the pump-motor set at low lift pumping station under grww.
Read moreStrengthening of the leaky blank plate on the extended portion of the 1500 mm dia. manifold pipeline of cwps ph-i, grww along with installation of blank flange, air valve and washout assembly on the same pipeline with other ancillary works.
Read moreServicing, overhauling, testing and commisisioning of service water pumps, jet pumps, pre- and post-chlorination pumps and their prime movers installed at different locations at wtp-iii, grww.
Read moreSupply, delivery, fitting- fixing of new spare parts by replacing worn out spares and testing, commissioning of chlorination system for chlorinator (20kg/hr.) no. 2 and 4 at wtp-iii, grww.
Read moreManufacturing, supply, delivery, fitting-fixing of damaged rotating assembly of pump unit no. 1 replacing with new spares , testing and commissioning of same at cwps-ii, grww.
Read moreRepairing of old damaged impeller with shaft including replacement of other rotating assembly and make as ready spare for high capacity pump unit no.-2 of phase-i at rwps under grww.
Read moreImprovement of outdoor illumination at the premises of raw water pumping station under grww.
Read moreCleaning and removing of idol frameworks, hyacinth, various floating materials, etc. stuck at the jetty of rwps ph-i,ph-ii and ph-iii including cleaning all the bell mouth also under grww for a period of 45 days.
Read moreof your Industry type